Cash Flow Estimation and Risk Analysis参考.ppt

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Cash Flow Estimation and Risk Analysis参考

* * * * * * * * * * * * * * * * * Project Operating Cash Flows, If Expected Inflation = 5% 12-* (Thousands of dollars) 1 2 3 4 Revenues 21 0 220 232 243 Op. costs (60%) - 126 - 132 - 139 - 146 – Depreciation - 79 - 108 - 36 - 17 EBIT 5 - 20 57 80 – Taxes (40%) 2 - 8 23 32 EBIT(1 – T) 3 - 12 34 48 + Depreciation 79 108 36 17 EBIT(1 – T) + DEP 82 96 70 65 Considering Inflation: Project CFs, NPV, and IRR Enter CFs into calculator CFLO register, and enter I/YR = 10%. NPV = $15.0. IRR = 12.6%. 12-* MIRR = 11.6%. Payback = 3.1 years. 0 -260 82.1 96.1 70.0 65.1 35.0 100.1 (Thousands of dollars) 70.0 96.1 82.1 -260 FCFs 1 2 3 4 Perform a Scenario Analysis of the Project, Based on Changes in the Sales Forecast Suppose we are confident of all the variable estimates, except unit sales. The actual unit sales are expected to follow the following probability distribution: 12-* Scenario Analysis All other factors shall remain constant and the NPV under each scenario can be determined. 12-* Determining Expected NPV, ?NPV, and CVNPV from the Scenario Analysis 12-* If firm’s average projects’ CVNPV range is 1.25-1.75, would this project have high, average, or low risk? With a CVNPV of 2.0, this project would be classified as a high-risk project. Perhaps, some sort of risk correction is required for proper analysis. 12-* Is this project likely to be correlated with the firm’s business? How would it contribute to the firm’s overall risk? We would expect a positive correlation with the firm’s aggregate cash flows. As long as correlation is not perfectly positive (i.e., ρ ? 1), we would expect it to contribute to the lowering of the firm’s overall risk. 12-* If the project had a high correlation with the economy, how would corporate and market risk be affected? The project’s corpora

文档评论(0)

2017meng + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档