- 1、本文档共39页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Cash Flow Estimation and Risk Analysis参考
* * * * * * * * * * * * * * * * * Project Operating Cash Flows, If Expected Inflation = 5% 12-* (Thousands of dollars) 1 2 3 4 Revenues 21 0 220 232 243 Op. costs (60%) - 126 - 132 - 139 - 146 – Depreciation - 79 - 108 - 36 - 17 EBIT 5 - 20 57 80 – Taxes (40%) 2 - 8 23 32 EBIT(1 – T) 3 - 12 34 48 + Depreciation 79 108 36 17 EBIT(1 – T) + DEP 82 96 70 65 Considering Inflation:Project CFs, NPV, and IRR Enter CFs into calculator CFLO register, and enter I/YR = 10%. NPV = $15.0. IRR = 12.6%. 12-* MIRR = 11.6%. Payback = 3.1 years. 0 -260 82.1 96.1 70.0 65.1 35.0 100.1 (Thousands of dollars) 70.0 96.1 82.1 -260 FCFs 1 2 3 4 Perform a Scenario Analysis of the Project, Based on Changes in the Sales Forecast Suppose we are confident of all the variable estimates, except unit sales. The actual unit sales are expected to follow the following probability distribution: 12-* Scenario Analysis All other factors shall remain constant and the NPV under each scenario can be determined. 12-* Determining Expected NPV, ?NPV, and CVNPV from the Scenario Analysis 12-* If firm’s average projects’ CVNPV range is 1.25-1.75, would this project have high, average, or low risk? With a CVNPV of 2.0, this project would be classified as a high-risk project. Perhaps, some sort of risk correction is required for proper analysis. 12-* Is this project likely to be correlated with the firm’s business? How would it contribute to the firm’s overall risk? We would expect a positive correlation with the firm’s aggregate cash flows. As long as correlation is not perfectly positive (i.e., ρ ? 1), we would expect it to contribute to the lowering of the firm’s overall risk. 12-* If the project had a high correlation with the economy, how would corporate and market risk be affected? The project’s corpora
您可能关注的文档
- Analyzing Consumer Markets and Buying Behavior参考.ppt
- Ancilla to Pre-Socratic Philosophers A Complete Translation of the Fragments in Diels, Fragmente der Vorsokratiker参考.doc
- Ancilla to Pre Socratic Philosophers A Complete Translation of the Fragments in Diels Fragmente der Vorsokratiker 前苏格拉底哲学家辅读参考.doc
- Analyzing the Marketing Environment参考.ppt
- Applications of Simple Interest Demand Loans参考.ppt
- Accounting Principles Statement of Cash Flows参考.pptx
- Applications of Simple Interest Valuation Principle参考.ppt
- Android客户端开发流程图及案例参考.doc
- An Investigation of Justice in supply chain relationships and their参考.ppt
- Applications of the Generalized Regression Model参考.ppt
最近下载
- 物业管理区域内房屋日常管理与维修养护方案.docx
- 新改版教科版三年级上册科学全册知识点(超全).doc
- 2030荆霄鹏《楷书入门基础教程》-结构.pdf
- 青海省1000MW风电场35kV集电线路杆塔结构施工设计图册.pdf
- 人教版音乐二年级上册《理发师》(课件).pptx
- 2023年上海市各区初三语文二模试题汇编之文言文译文汇总.docx
- 材料与诊疗项目关系对照库2013.12.27.xls
- 人教版八年级上册英语单词词性转换词形转换.docx
- IPCEIAIPCJEDECJ-STD-002E-2017元器件引子、焊、接柱和导可焊(中文版).pdf
- 普通高中学校办学水平督导评估自查报告.pdf
文档评论(0)