毕业论文资料翻译原文-周杰伦.doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
毕业论文资料翻译原文-周杰伦

EPC-400 control unit The EPC-400 control unit is designed and programmed to handle all necessary function of the cleaning system, in accordance with preset parameters. The display on the control is used for indication of parameter numbers and values which can be visualized on request. Normally the remaining time to next sludge discharge is displayed. Information on how to check the progress values is found in chapter 7.1.2 Fuse main switch ON/OFF LEDs for alarm inputs (red) Alarm input diagram LED for stop sequence running (yellow) LED for control program running (green) LED for external preheater on (green) External preheater ON/OFF push-button Control program ON/OFF push-button Sludge discharge push-button Alarm reset Function symbols LED for main alarm (red) LED for discharge failure (red) Display System output diagram LEDs for system output (green) Door lock 9.1.1 Fuses and related functions Board fuse Functions influenced alarm EPC-400 front board A1 F1 10 V AC supply to the board Remote alarm display black(A4 when new fuse) F2 20 V AC supply to the board Analog/digital conversion Pt-100 inputs A 1-4 A2-6 C/F EEE F3 All outputs PS 42 EPC-400 rear board A2 F2 10 V AC supply to the board A 1-4 F3 Internal communications A 1-4 At restart with new fuse, switch power ON -OFF -ON 9.2 EPC-400 parameter functions Selecting activities and parameter values is done inside the control unit cabinet. Before any parameter setting or supervision of parameters is possible, the mode selector must be set in “P” position. Parameter numbers and values are selected by means of the four pushbuttons. The two upper ones are used for parameter selection and the two lower ones for setting the values. The parameters are divided in: Process parameters (C1): P1-P19 Installation parameters (C2): P20-P99 When setting parameters at start up set the installation parameters first and then proceed with the process parameters. parameters number – increase parameters number – d

文档评论(0)

asd522513656 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档