- 1、本文档共32页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TechnicalEnglish3化工工程技术管理(英文)
January 2007 Course material is the property of Thomas Brownlie and can only be used or reproduced with written permission Planning and Construction Project Planning and Construction Project Phases Planning Tools and Terms Review Construction Construction Trades Review Project Phases Project feasibility – Budget Estimate Scope Definition – Define goals, limits Process Definition – How will it work Detailed Design – Sizes, quantities, models Construction – In the field Commissioning and Start-up Different companies and teams use different names to describe the activities required to complete a project – it is important to understand what needs to be done, not a particular nomenclature Project Controls Active throughout the project Should include cost control and schedule May include quality control Needs constant inputs and reviews Meeting the Schedule You need a realistic schedule You need adequate project controls staff You need to constantly review progress versus plan Provide contingency plans for probable problem areas Be prepared to decide between costs and schedule Manage change – No Change Mentality Pert Chart Planning Terms Activity / Task Duration Predecessors Linked Tasks Milestone Resources Critical Path Float Gantt Chart Gantt Chart Gantt chart A Gantt chart is a horizontal bar chart developed as a production control tool in 1917 by Henry L. Gantt, an American engineer and social scientist. Frequently used in project management, a Gantt chart provides a graphical illustration of a schedule that helps to plan, coordinate, and track specific tasks in a project. Gantt charts may be simple versions created on graph paper or more complex automated versions created using project management applications such as Microsoft Project or Excel. A Gantt chart is constructed with a horizontal axis representing the total time span of the project, broken down into increments (for example, days, weeks, or months) and a vertical axis representing the tasks th
您可能关注的文档
最近下载
- 2024年海南省中考化学试卷(含答案).docx
- 人教PEP版四年级上册英语Unit 3 My friendsPart B Let's talk—Let's play课件.pptx
- 《论语》中的“学”与“好学”.doc VIP
- 部编版小学语文三年级上册《快乐读书吧:在那奇妙的王国里》说课稿(附教学反思、板书)课件.pptx
- 第四节 IS—M模型与财政政策效应.ppt VIP
- (2023)宿舍安全知识竞赛真题库及答案(通用版).docx
- 高校教师资格证面试说课课件-醛酮.pptx VIP
- 雨季施工方案.doc VIP
- 台湾文学之台湾诗歌课件.ppt
- 计量经济学基础 第3版 课件 张兆丰 第1--7章 导论、 回归与回归分析---多元线性回归模型的推断.pptx
文档评论(0)