《毕业设计(论文)-工程变更对造价的影响及控制》__精品.doc

《毕业设计(论文)-工程变更对造价的影响及控制》__精品.doc

  1. 1、本文档共45页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《毕业设计(论文)-工程变更对造价的影响及控制》__精品

摘要 在工程实践过程中,由于业主要求、设计和环境等原因工程变更经常发生,工程变更的费用也是工程造价的控制的重点。文章从实践中的工程出发,归纳和总结工程变更对建设项目造价控制的影响因素。75% 以上,因此设计质量对整个工程建设的效益是极为重要的。如果在设计阶段考虑不周,势必会在以后施工过程中出现工程变更,包括设计变更、施工条件变更以及原招标文件和工程量清单中未包括的“新增工程项目”等,从而对工程造价带来影响,使工程项目目标控制极为不利。因此,程设计阶段应充分考虑各种可能情况,以加强对工程变更的控制,从而达到控制工程造价的目的。 关键词: ABSTRACT This article on the project change and building cost of projectss close union, as well as the question which and the solution way exists to the construction process in elaborates, achieves the scientific management active control investment the goal. In recent years, items of basic constructions move of bid has hastened the consummation, but in the construction process the project changes situation are many, is also very big to building cost of projectss influence, that determined that reasonably the change the project cost, controls the entire project effectively the building cost of projects, to maintains the contract fulfillment the solemnity and just principle especially important. In project practice process, because the owner requests, reason project changes and so on design and environment occurs frequently, the project changes expense is also the building cost of projects control key point. The article embarks from practice project, induction and summary project change to items of basic construction cost control influencing factor. Building cost of projects control penetration in project construction entire process, but before the key lies in the construction the investment decision and the design stage, indicated according to the related statistical data, policy-making and design jie section influence building cost of projects degree above 75%, therefore the design quality to the entire engineering constructions benefit is the great importance. If in the design stage consideration week, will not present the project change inevitably in the later construction process, including the design alteration, in the execution conditions change as well as the original tender document and

文档评论(0)

seunk + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档