Blowout and Well Control Handbook_04b推荐.pdfVIP

  1. 1、本文档共42页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Blowout and Well Control Handbook_04b推荐

Annular Pressure Profile Previous Page Wait and Weight Method ) i s p ( e r u s s e r P r a l u n n A Volume Pumped (bbls) Figure 4.19 is used, rig personnel would expect that the maximum annulus pressure would be 759 psi, with gas to the surface; that the total pit level increase would be 50 barrels, which might cause the pits to run over; that gas would be at the surface in two hours [(406 — 50)/3] or less, depending on influx migration; and that dry gas might be vented at the surface for a period of 20 minutes, at an equivalent rate of 12 million cubic feet of gas per day. Certainly, these events are enough to challenge the confidence of unsuspect- ing and uninitiated rig personnel and cause a major disaster. Be prepared and prepare all involved for the events to come. CONSTANT CASING PRESSURE, CONSTANT DRILLPIPE PRESSURE, AND MODIFICATION OF THE WAIT AND WEIGHT METHOD After a well kick, the basic philosophy of control is the same, regardless of the procedure used. The total pressure against the kicking formation is maintained at a value sufficient to prevent further fluid entry and below the pressure that would fracture exposed formations. Simplicity is generally emphasized because decisions have to be made quickly when a well kicks, and many people are involved in the control procedure. With the inception of current well control procedures, there was a considerable emphasis on the Drillers Method because the formation influx was immediately displaced. In recent years, it has become apparent that the Drillers Method, while simple, may result in an underground blowout that could have been prevented. Thus, many operators have a

文档评论(0)

seunk + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档