TimeStudy教程.doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
TimeStudy教程

Organisation Progress Referential “Determination of Unit Times”. AIM This referential describes the methods and tools to be implemented for establishing unit times. AREA OF APPLICATION This referential is to be applied by 01/09/2005 at the latest in all the industrial entities in the Group. The users of the referential are the members of the Organisation and Progress métier who have been validated for the post of Study Organiser. DEFINITIONS Unit Time : This is the time it takes a capable and trained operator to complete a Unit of Production (U.P) or a Unit of Work in determined conditions, using the method, machines and equipment provided. You will find an example of a Unit Time sheet at the end of this document. Chronométrage (Time-study)?: Time-study is the operation which consists in: Checking that the Method of Work is correctly applied. Assessing and recording the working rate of the operator observed. Measuring and recording times. You will find an example of a time recording sheet at the end of this document. Work Element : This is a portion of work demarcated by two measurement references and consisting of an ordered sequence of defined actions of a homogeneous nature. Concept of rate : An operator’s working rate is his instantaneous speed of execution of a useful piece of work when this speed is dependent solely on the operator’s working rhythm. This rate or speed takes account of the execution conditions (difficulty, precision, ergonomics, etc.). Rating : This is the operation by which a qualified organiser assesses the working rate of an operator in relation to his mental image of a rate of 100. Reference rate : The reference rate is known as “Rate 100”. This is the working rate which any average operator, capable, trained and qualified to occupy the post, can maintain constantly throughout his working time at the post (generally an 8 hour shift), without damaging his health. This rate is calibrated on the pre-determined time standards (M.T.M.)

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档