管道工程的目标与展望(管道局200906)(the target and prospect of pipeline engineering (pipeline bureau 200906))_精品.doc
- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管道工程的目标与展望(管道局200906)(the target and prospect of pipeline engineering (pipeline bureau 200906))_精品
管道工程的目标与展望(管道局200906)(The target and Prospect of Pipeline Engineering (Pipeline Bureau 200906))
One day apart, such as three autumns. Polish, such as cut, such as grinding. Learning proficiency for officialdom, awfully. Shoot first shoot horses, qinzeixianqinwang. Dont know spring bitter, do not send wicker green. This paper contributed by hbyangyuehui.
PPT document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view.
The target and Prospect of pipeline engineering
The target and Prospect of pipeline engineering
Chinese Petroleum Pipeline Bureau
Two June OO nine years OO nine years in June
Http:// China Petroleum Pipeline Bureau
The target and Prospect of pipeline engineering
13
The present situation of the construction of Chinas oil and gas pipeline
Two
The oil and gas pipeline development goals and Prospects
Chinese Petroleum Pipeline Bureau
The target and Prospect of pipeline engineering
China is the worlds first use of the pipe conveying fluid of the country, China is the worlds first use of the pipe conveying fluid state, in the early Han era (221263 ad 221 in early Han era (A.D. 221-263) have used bamboo Connected Brine and natural gas transportation. Chinas oil and gas pipeline industry Connected Brine and natural gas transportation. The exhibition has been 50 years of history. The exhibition has been 50 years of history. Half a century history of the construction of oil and gas pipeline for 50 years has appeared three climaxes. The building has appeared in the three climax.
Chinese Petroleum Pipeline Bureau
The target and Prospect of pipeline engineering
The first climax in the last century in 70s, the first climax in the last century in 70s, when the construction of a pipeline is developed from Eastern Daqing, 70s, Shengli Oilfield in Liaohe large. The development of source in the eastern Daqing, Liaohe, Shengli oil field large. After several years of hard work, build into onshore oil a
文档评论(0)