环台水泥制品股份有限公司文件名称品质工程管理表.doc

环台水泥制品股份有限公司文件名称品质工程管理表.doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
环台水泥制品股份有限公司文件名称品质工程管理表

Quality Engineering Management Table Lost Wax Casting Process (investment casting) Doc. No. 4-02-001 Date: 2002.11.30 Version: 1 Works Management items Management method Ref. documents No. Station Item Quality request Method/equipment Timing Duty Inspection record Check basis 1 Incoming material Inspection As per “Incoming material inspection control standard” 3-10-001 2 Material in stock As per “Moving, saving and packing management” 2-15-001 3 Dissolve and add wax Wax quality Clean Visual Once/ 2 weeks Worker leader Yes 4-09-003 4 Wax injection bar Surface of wax bar Smooth Visual Full Worker No 3-08-003 5 Wax injection 1、Letters Clear, Correct Visual Full Worker No Process control chart 2、Appearance No bubble, Smooth Visual Full Worker No 3、Internal holes No deformation Visual Full Worker No 4、Q’ty Process control chart Calculation Per lot Worker Process control chart Process control chart 5、Pressure Process control chart Wax injection pressure chart Per lot Worker Process control chart Process control chart 6、Temperature Process control chart Wax injection temperature chart Per lot worker Process control chart Process control chart 7、Time of wax injection Process control chart Time table of wax injection Per lot Worker Process control chart Process control chart 6 Wax repair Burrs De-burrs Visual Full Worker No 7 Pattern assembly 1、Correct way for wax bar and pattern assembly Wax pcs assemble smoothly to wax bar joint Visual Full Worker No Process control chart 3-08-003 2、Material mark Correct Visual Full Worker No Process control chart 3-08-004 3、Q’ty calculation Correct Visual Full Worker No Process control chart 8 Hanging and clean wax pcs 1、Hanging Iron slice stay close to wax bar Visual Full Worker No 2、Clean wax pcs Clean fully Visual Full Worker No 9 Dipping 1、Concentration 28-30secs Stop watch and No.5 glass Once/day Worker leader Shell temperature, humidity and thick liq

文档评论(0)

ailuojue + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档