- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
专业能源人才求挑战性工作英文简历
专业能源人才求挑战性工作英文简历
范文参考网最近发表了一篇名为《专业能源人才求挑战性工作英文简历》的范文,好的范文应该跟大家分享,这里给大家转摘到范文参考网。
SUMMARY OF QUALIFICATIONS:
Structural design and construction of nuclear facilities at DOE Los Alamos National Laboratory.
Analysis and design of special equipment and facilities for recovery of spent nuclear fuel elements at DOE Hanford Site.
Structural design of Pit 9 recovery building for DOE Idaho National Engineering amp;Environmental Laboratory.
Structural/seismic design of diesel generator building for upgrade of process canyons at DOE Savannah River Site.
Experienced and knowledgeable of code requirements and standards for steel,concrete and masonry structures.
OBJECTIVE:
Practice as a professional engineer with an organization that offers challenging projects to work on,provides a climate of fairness for employees and pays a fair wage.
WORK EXPERIENCE:
For each of the following assignments I served as the licensed Engineer of Record.
Neutron Tube Target Loading Project,Los Alamos National Laboratory,1995-1997
Designed and supervised design and drafting for new tritium facility including reinforced masonry shear wall building,modification and upgrade of an existing reinforced concrete building and foundation for a new steel building.
Conducted seismic lateral load analysis for entire facility.
Wrote design criteria and prepared construction specifications and drawings.
Developed structural test and inspection plans and integrated structural design with electrical,mechanical and architectural disciplines.
Reviewed and approved vendor submittals,managed construction documents,supported change control process and prepared as-built project records.
K-Basin Spent Nuclear Fuel Project,Hanford Site,1997-1998
Conducted structural analysis and design for the Cold Vacuum Drying System and the Hot Conditioning Facility.
Conducted seismic analysis of the 25 ton Hot Conditioning System process steel enclosure.
Pit 9 Remediation Project,Idaho National Engineering amp;Environmental Labor
您可能关注的文档
- 七颗钻石的评课稿.doc
- 丅一站、守候的qq情侣网名 浪漫.doc
- 丅嗰路口, 見的qq情侣网名 浪漫.doc
- 万事不求人作文.doc
- 万世流芳的成语解释及意思.doc
- 万事大吉造句大全.doc
- 万亩梨园作文.doc
- 万以内的退位减法教案.doc
- 万人体育场.doc
- 万众一心的作文.doc
- 北师大版小学数学三年级上册《寄书》教学设计.docx
- 统编版(部编版)语文二年级上册《雪孩子》教学设计.docx
- 统编版(部编版)语文二年级上册《八角楼上》教学设计.docx
- 北师大版小学数学三年级上册《长方形周长》教学设计.docx
- 北师大版小学数学三年级上册《丰收了》教学设计.docx
- 统编版(部编版)语文二年级上册《夜宿山寺》教学设计.docx
- 统编版(部编版)语文二年级上册《风娃娃》教学设计.docx
- 统编版(部编版)语文二年级上册《朱德的扁担》教学设计.docx
- 统编版(部编版)语文二年级上册《难忘的泼水节》教学设计.docx
- 统编版(部编版)语文二年级上册《纸船和风筝》教学设计.docx
文档评论(0)