单层工业厂房结构安装施工资料38871Singlestoreyindustrialbuildingstructureinstallationscheme38871.doc

单层工业厂房结构安装施工资料38871Singlestoreyindustrialbuildingstructureinstallationscheme38871.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
单层工业厂房结构安装施工方案38871(Single storey industrial building structure installation scheme 38871) A factory building, designed for single span single frame steel structure workshop, 41m long, about 6m, a total of 9 internodes, steel roof. The flat and cutaway drawings of the plant are shown in the diagram. The construction method of this project: the roof adopts 0.5mm thick W750 color profiled steel plate and edge wrapping angle, single ridge double slope drainage. The wall adopts sand lime brick masonry wall, reinforced concrete beams and columns. The main hoisting project is 16.6m steel roof truss, steel roof truss weighs 61.4KN, a total of 8, elevation 5.5m. Two. Preparation before structural installation (1) at the construction site of the factory, the hoisting parts should be put into place before lifting the components, the position of the supporting pad should be correct, and the position of the lifting point should be in line with the design requirements. (2) the site of pile components should be flat and solid. (3) when the component is in place, it should be laid on the cushion or bracket according to the force of the design, and should be kept stable. Three. Structure hoisting method After the steel roof truss is made in the factory, it is transported to the site by car. The roof system includes a roof, and roof purlin. The hoisting process of each component is as follows: Lashing - lifting - alignment - temporary fixing - correction - Final fixing Four. Selection of crane and calculation of working parameters The structure hoisting uses the automobile crane QY16 type, the hoisting main components work parameter is: roof truss Hoisting by two points lashing. Claim weight Q=Q1+Q2= (61.4+3.0) KN=64.4 KN The lifting height is shown in figure H=h1+h2+h3+h4= (5.5+0.3+2.7+3.0) m=11.5m Because the crane can be restricted to the hoisting position nearby, it is not necessary to check the lifting radius R. The steel roof in place after the need for multiple trial lifting

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档