网站大量收购独家精品文档,联系QQ:2885784924

水力工程毕业设计--混凝土重力坝_设计计算书【毕业设计(论文)】-好[精品].doc

水力工程毕业设计--混凝土重力坝_设计计算书【毕业设计(论文)】-好[精品].doc

  1. 1、本文档共71页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水力工程毕业设计--混凝土重力坝_设计计算书【毕业设计(论文)】-好[精品]

水力工程毕业设计--混凝土重力坝_设计计算书【毕业设计(论文)】-好 Abstract The Lingjiang Hydro-junction Projects are at I level and located on the Lingjiang River And the projects are composed of the power plant dam the overflow dam the overflow dam with big orifices the overflow dam with deep orifices and the powerhouse behind dam The installed capacity is about 900000 kilowatts 6×15 ten thousand kilowatts and it is an item with synthesis benefits such as the flood prevention electricity generation irrigation shipping and cultivation It is called to be a great project for nature reform This design includes the construction diversion and the design for foundation treatment In the design we have fully proven the key position terrain landform condition in the place analysis the hydrology geology situation and the meteorological data and so on Considering the local construction condition the rests on each kind of hydraulic engineering standard we draw up the conduction current way that is to use the partition coffer dam law conduction current initially and the conduction current time interval is perennial diversion The conduction current standard is 20-year frequency flood according to the basic document Through the quantitative terms and the conduction current plan economical comparison the programmer for diversion is embankment cofferdam contracted river and the bottom orifice for releases In the design we use the rectangle diversion orifice in the diversion In the construction we determined the various types of construction machinery and the number by the calculation of works of the buildings In the closure work design we determined the different particle size and number of river materials the current situation through the river hydro calculation In the reference pit drainage design we determined the periods drainage equipment through the displacement calculation in every period In basic processing component the use of blast by bore holes to excavate the dam foundation Blasting parameters an

文档评论(0)

bodkd + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档