MY水电站课程设计.doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MY水电站课程设计

Summary about the Miyun Hydropower The Miyun Reservior ,strides across Cao Rriver and Bai River ,twenty kilometers from the MiYun,is located in the north of that .The two rivers are combined into CaoBai River ,which is ten kilometers from the MiYun town, in the north of the town . The lowest watershed of the Cao River and Bai River is JinGou River ,whose height is 130 meters ,in which CaoRiver Reservior and BaiRiver Reservior are joined .The else part of the Cao River and Bai River ,whose height higher more than 130meters ,combined into a reservoir,namely MiYun Reservior .The several—annual mean river discharge is 50.5 m3/s . The MiYun Reservior , whose main mask are controlling flood and supplying water for agriculture ,is an integrated hydraulic engineering , and also could supply with the benefit of generating electricity. Some characteristic water level of the reservoir as follows : Dead water level : 126.0m ; Normal high water level : 157.5m ; Design flood level : 158.2m ;Check flood level :159.5m ; Height of the top of dam: 160.00m . Main marine construction include : (1).Blockwater structures : The BaiRiver dam and the CaoRiver dam consist into the two Main dams and five secondary dams ,are rolled—out earth rock dam ;the highest dam is the BaiRiver main dam ,whose height is 66.4m ;CaoRiver main dam highs 56m ;each secondary dam high 15.7m-39.0m . (2).Outlet structures : ①.Spillway :including two ones in the left shore of the CaoRiver , first spillway and second spillway . The first spillway , is a normal one, whose bottom height is 140m , draing the 100—annual flood , which is five holes riverside type with bosomwall . The second spillway , is a abnormal one ,whose bottom height is 148.5m combining with the first one ,draining the 1000—annual flood , which is five open riverside type . ②.Tunnel : a. The generate electricity tunnel in the left shore of the BaiRiver , generating electricity and supplying with water for downstream agriculture ; a outlet sup

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档