网站大量收购独家精品文档,联系QQ:2885784924

广1平5井_地质导向分析.ppt

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Well Placement Schlumberger XCH/WYF 2009-9-1 Content Landing Plan and decision make着陆计划和指令 Decision making after the Landing着陆后指令 Analysis总结分析 Landing Plan-Target top prediction(着陆计划—目的层预测) Landing Plan (着陆计划) decision make at Landing point (着陆点指令) Decision making after the Landing—Why build? Decision making after the Landing—how to build? Result Thanks! Schlumberger Confidential Schlumberger Confidential G1P5 地质导向分析报告 Projected Target top @ 1830.5m TVD according Q1-3-1(1) Top @1826.5m Model indicated Formation dip down 0.5deg Case 1: Target top is at 1830.5m TVD Case 2: Target top is at 1832m TVD From the case2, the VS will delay 15m comparing with original plan, Plan target A, confirm with client. 方案2中水平位移滞后15米, 和客户确认 WP suggest landing with inclination 87.5deg or more to decrease the risk of touch bottom or delay VS if possible. Client agreed the suggestion WP建议以87.5度以上着陆,以保证油层厚度在0.8米不触底 Target top @ 2004.3m, Slide from 2012m, build up to 89.4deg at 2025m, TVD drop 0.47m 2. No repeat section in Gr and Res curves 1. It is cutting down according to the azimuthal data from GVR 3. Cuttings are not from the top of target formation Case 1: same dip, should chasing target at 2056m MD/1831.8m TVD Case 2: Plate, should chasing target at 2090m MD or more 1.Keep incl between 90-90.5deg to reduce the risk of drill out the target again 2. It is expected at 2060-2070m MD dip0.5deg 1. Build up to 91-92deg to explorer the target 2. It is expected at 2090-2100m MD dip0.5deg Current depth2117m MD/inclination 92deg 1830.6m TVD 1m 0.4m Scenario 2– formation dip down quickly(2o) 1m 0.4m Scenario 3– formation dip up(2o) 0.4m 1m Scenario 1– formation pitch out or property change Not worth to drilling ahead due to no reservoir Huge drilling and geological risk for sidetrack due to Unstable and complex structure * * Schlumberger Confidential Schlumberger Confidential

文档评论(0)

xingyuxiaxiang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档