- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献翻译
()
文献出处: Nuclear Instruments Methods in Physics Research, 2015, 3(2):281-294.
英文原文 Importance of construction organization design
G Baecker
Abstract
During the construction process of a construction project, the advantages and disadvantages of the construction organization scheme not only directly affect the quality of the project, but also have an important impact on the duration and the safety of the personnel during the construction process. The construction organization is an important technical and economic document for the project construction and guidance of project construction. Can adjust the contradiction of personnel, machinery, raw materials, environment, process, equipment, civil construction, installation, management, production, etc. in construction. It is necessary to supervise and control the construction organization design so as to ensure the project quality with high quality, low cost, and less Energy consumption is completed.
Key words: Project Management, Construction Organization, Program Importance
Construction organization design is the conception and specific arrangement of the entire construction process of the engineering construction project. It is the core and soul of the construction organization management work. Its purpose is to make the project faster, better quality, and more efficient. Make the whole project get relatively optimal results in the construction.
1. The reason for the importance of the design of construction organization
The construction project and its construction have three characteristics: fixed and fluidity, diversity and individuality, large body and long construction period. Therefore, the construction of each construction project must be carried out. This is because: The production of other general industrial products has its own fixed, long-term factory. The construction of the building is fluid, and it is impossible to establish such a factory. It is only when each construction project is construc
您可能关注的文档
- 汽车防盗报警器外文文献翻译中英文.doc
- 数据库管理系统外文文献翻译中英文.doc
- 公路线形设计外文文献翻译英文参考.doc
- 工程管理外文文献翻译混凝土施工.doc
- 二手物品交易网站外文文献翻译中英文.doc
- 网页设计与制作外文翻译文献中英文.doc
- 数控机床与原理外文文献翻译中英文.doc
- 变电站建设外文文献翻译中英文.doc
- SBS改性沥青外文翻译文献.doc
- 同步电动机外文文献翻译中英文1.doc
- 10《那一年,面包飘香》教案.docx
- 13 花钟 教学设计-2023-2024学年三年级下册语文统编版.docx
- 2024-2025学年中职学校心理健康教育与霸凌预防的设计.docx
- 2024-2025学年中职生反思与行动的反霸凌教学设计.docx
- 2023-2024学年人教版小学数学一年级上册5.docx
- 4.1.1 线段、射线、直线 教学设计 2024-2025学年北师大版七年级数学上册.docx
- 川教版(2024)三年级上册 2.2在线导航选路线 教案.docx
- Unit 8 Dolls (教学设计)-2024-2025学年译林版(三起)英语四年级上册.docx
- 高一上学期体育与健康人教版 “贪吃蛇”耐久跑 教案.docx
- 第1课时 亿以内数的认识(教学设计)-2024-2025学年四年级上册数学人教版.docx
文档评论(0)