- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外文文献翻译
()
英文原文 The SBS modified pitch match ratio design and discussion of construction technology
The summary
under good design match ratio and execution conditions, SBS pitch can make the durability on the pitch road surface and high-temperature stability obviously improve . This text will test the situation according to the construction of No. two in the south , will tell the construction specification requirement for the modified pitch of SBS briefly .
First, SBS modified pitch summary
The modified pitch of SBS is on the basis of original host pitch (AH-70 ), is it add 2.5% - 3.0% to mix, 4.0% SBS modify pharmaceutical, modify pitch after , compare with original pitch, its high-temperature viscid increases, soften and click rising. Under good design match ratio and execution conditions, the durability on the pitch road surface and high-temperature stability obviously improve. Test while going on in a large number of rooms while the modified pitch of SBS produces, carry on the on-the-spot experiment to its technical indicator after production, experimental result indicate outside mix 3.0% modified pitch of SBS , soften some , needle enter degree index meet modified pitch standardize the request, can make the match ratio design of the pitch mixture with the modified pitch of SBS .
Second, the match ratio of the pitch mixture of SBS is designed
In order to enable the mixture designed to reach the implementing effect, need to propose the following request from a great deal of respects , such as material requiring , construction craft , quality control standard and quality control method ,etc., hope to arouse attention.
(1) , the raw materials are required
Collect the material thickly by 1-1:
For the thick collection material of layer the modified pitch mixture, should adopt the broken stone or garrulous gravel , its specification of foot-path and quality requirement should accord with the regulation of pitch road surface construction technical specification of th
您可能关注的文档
- 汽车防盗报警器外文文献翻译中英文.doc
- 数据库管理系统外文文献翻译中英文.doc
- 公路线形设计外文文献翻译英文参考.doc
- 工程管理外文文献翻译混凝土施工.doc
- 二手物品交易网站外文文献翻译中英文.doc
- 网页设计与制作外文翻译文献中英文.doc
- 数控机床与原理外文文献翻译中英文.doc
- 变电站建设外文文献翻译中英文.doc
- 施工组织设计外文文献翻译中英文.doc
- 同步电动机外文文献翻译中英文1.doc
- 第十一章 电流和电路专题特训二 实物图与电路图的互画 教学设计 2024-2025学年鲁科版物理九年级上册.docx
- 人教版七年级上册信息技术6.3加工音频素材 教学设计.docx
- 5.1自然地理环境的整体性 说课教案 (1).docx
- 4.1 夯实法治基础 教学设计-2023-2024学年统编版九年级道德与法治上册.docx
- 3.1 光的色彩 颜色 电子教案 2023-2024学年苏科版为了八年级上学期.docx
- 小学体育与健康 四年级下册健康教育 教案.docx
- 2024-2025学年初中数学九年级下册北京课改版(2024)教学设计合集.docx
- 2024-2025学年初中科学七年级下册浙教版(2024)教学设计合集.docx
- 2024-2025学年小学信息技术(信息科技)六年级下册浙摄影版(2013)教学设计合集.docx
- 2024-2025学年小学美术二年级下册人美版(常锐伦、欧京海)教学设计合集.docx
文档评论(0)