- 1、本文档共76页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IT项目管理课件11.000
Quality Review Frequency When to review a process or work product: On a periodic basis: daily, weekly, monthly, quarterly, annually, etc. Audit each major process at least annually When specific events occur, such as : Upon completion of requirements document Upon completion of life cycle phases For each release Only when a serious problem is identified, etc. Quality Review Frequency Could review a predefined percent of a work product, such as 25% of all code designs Could review 100% of them (all) Could perform that review only when directed by QA Management (implies rarely) Quality management plan should identify the scope of QA activities in these terms Extent of these planned activities determines whether QA role is passive or active Review Criteria When performing process assessments, process evaluations, process verifications, and product evaluations, there are many things for which the reviewer could be looking The report describing the results of this review activity should identify which of these review criteria were used Review Criteria Completeness - Extent to which the process is followed through to completion, or the product is free from TBD’s Compliance - Extent to which the product adheres to specified standards (CMM, IEEE, ISO, etc.), regulations, and laws Conformance - Verification that the documented process is used and performed on schedule Review Criteria Consistency - Extent to which the process is consistently used by all members of the affected organization Contractual Requirements - The extent to which the process fulfills the stated contractual project requirements Control - Extent to which the process, documentation, and referenced tools are constrained by a configuration management system Review Criteria Correctness - Extent to which the process is producing correct output, based on peer review and customer evaluation of the output Definition - Extent to which the process is described and documented Editorial Correctness - Extent to whi
您可能关注的文档
- ch01-MATLAB2007简介.ppt
- 第八章质量管理体系内部审核员.ppt
- 原子结构与元素周期表测试及答案.doc
- 2010年高三数学.doc
- ireport设计过程中遇到的一些细节问题解决方法.doc
- 本科计算机1.doc
- 六数学欣赏与设计.ppt
- 烧结工艺实习报告.doc
- 营业税、土地增值税、印花税、房产税计算题.doc
- 会计系学生会元旦联欢会.doc
- 新概念一册13-14课课件PPT.pptx
- 2025-2030中国樟脑油行业市场发展趋势与前景展望战略研究报告.docx
- 2025-2030中国模具连接系统行业市场发展趋势与前景展望战略研究报告.docx
- 消防应急预案演练方案范文(精选3篇).docx
- 2025-2030中国模具钢板行业发展分析及投资前景预测研究报告.docx
- 2025-2030中国模具钢行业产销需求及发展状况前景预测研究报告.docx
- 2025-2030中国楼宇保安系统行业发展分析及发展趋势预测报告.docx
- 儿童过敏性鼻炎病例研究 诊断、护理和预后评估.pptx
- 随机区间收益下的投资组合研究.doc
- 2025-2030中国楼宇智能化行业深度分析及发展前景与发展战略研究报告.docx
最近下载
- 双减背景下新课标单元整体作业分层设计案例 人教版初中英语七年级下册 Unit 1 Can you play the guitar.docx
- 基于RFID的物流信息系统设计设计.doc VIP
- 基于STM32的智能家居远程控制系统技术研究与毕业设计.docx
- 地质构造对煤与瓦斯突出危险性影响研究.pptx VIP
- 雨污水管道非开挖修复方案.pdf VIP
- 2018必威体育精装版华师大1803文学文本解读试卷及答案2.doc
- 构造煤研究现状及其对煤与瓦斯突出产生影响.doc VIP
- 第7章 SDN综合应用开发v1.1《软件定义网络(SDN)基础教程》.pptx VIP
- 11 整理书包(说课稿)-2023-2024学年一年级下册综合实践活动全国通用.docx
- 河北开放大学2024年《西方行政制度》形成性考核1-4答案.docx
文档评论(0)