Part Qualification Process:部分鉴定过程.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Part Qualification Process:部分鉴定过程

Part Qualification Process Introduction Purpose To determine if all Dell engineering design record and specification requirements are fully understood by the supplier and that the supplier’s process has the potential to produce product meeting these requirements during an actual production run at the normal production rate. Scope Defines the procedure of part qualification for all production and service commodities, including bulk materials. These guidelines apply to all Dell regional facilities and Suppliers. applicable documents Quality Management Plan (QMP) Cor40.WWP.SQ.0139 Manufacturing Quality and Test Plan (MQT) Cor40.WWP.SQ.0143 Part Qualification Process (PPAP) Templates Cor40.WWP.SQ.0140 Warrant Form RSV Request for Specification Variance FAI Initial Sample Report Cp and Cpk studies AAR Appearance Approval Report Gage RR Gage Reliability and Repeatability Flowchart PFMEA Process Failure Mode and Effect Analysis Control Plan Process/Machine Set-up sheet In-process Control Plan Quality Concerns Template Packaging Work Instruction/Inspection Aid Template Part Submission Warrant Work Instructions Cor40.WWP.SQ.0141 PPAP Tracking Matrix Cor40.WWP.SQ.0145 PROCEDURE General Guidelines Part Qualification is always required prior to shipment of the first production lot of material. Completing and submitting and/or retaining documents, hereafter elements, as defined in the Part Qualification Process Templates, Cor40.WWP.SQ.0140, accomplish Part Qualification. The following situations identify common instances where the Part Qualification Process is utilized, moreover, its use is not exclusive of other possible scenarios. New Part or New Tool Engineering Changes Tooling Transfer, Replacement, Refurbishment Correction of Discrepancy Change to Optional material Change in Part Processing Sub-supplier or Material Source Change For each part that is presented for Qualification the supplier will be required to submit the number and scope of documents identified

文档评论(0)

153****9595 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档