PDT 流程最佳实践讲解材料.ppt

  1. 1、本文档共29页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PDT 流程最佳实践讲解材料.ppt

PDT流程最佳实践 PDT Procedure Best Practices;PDT重要性/PDT Importance PDT程序文件的目的Purpose of PDT procedure? PDT在SIM流程中PDT in SIM SIM流程结构SIM Structure PDT交付些什么?What are my team’s deliverables? PDT建立/PDT Establishment PDT流程图PDT Flowchart 谁来建立和领导PDT?Who should initiate and lead a PDT? 何时需要建立PDT?When is a PDT required? PDT小组何时建立?When should my team be formed? PDT会议间隔多长时间召开?How often should we meet? ;PDT流程最佳实践 PDT Procedure Best Practices;PDT重要性 PDT Importance;PDT程序文件的目的 Purpose of PDT procedure;Single system/sub-system focus 单个系统/子系统 All vehicles 所有车型 SMT director (chair) 总监(主席) VSEs (lead discussion) VSE(主持讨论) Cross-functional participation (跨功能块参与) Time Architected: Weekly, each program Reviewed monthly 每周一次,每个项目每月一次;SIM流程结构 SIM Structure;PDT交付些什么? What are my team’s deliverables?;PDT建立的提出 Apply for PDT establishment ? ;在新开发车型和改型项目中,DRE是相关产品开发的PDT的领导者。 During new vehicle developing project and vehicle upgrading project, DRE is the PDT leader for related products. 针对特殊问题,如工艺问题、供应商质量问题及商务问题等,也可以成立PDT,制造工程师(ME)、供应商质量工程师(SQE)、采购员(Buyer)等将是相应 PDT领导者。 To special issues such as process issues, suppler quality issues, business issues and so on, PDT can be built. And ME- Manufacturing Engineer, or SQE- Supplier Quality Engineer, or Buyer will be the related PDT Leader. ;PDT应按需要建立,不需强制建立,如 PDT’s should be formed as needed, not forced. Examples: 不是所有部分需要PDT Not every partition needs a PDT. 特殊PDT应用于解决重要的问题 Special PDTs should be formed for focused issues. 综合PDT应当由公同需求来驱动 Integrated PDTs should be driven by common interface needs. VSE负责提出PDT建立和取消的需求 VSE responsible for presenting the demand of PDT establishment and elimination. SMT审批后建立或解散PDT SMT approval is required to omit, combine or eliminate PDTs.;对新产品开发,根据项目的整车开发流程,在ASI或VPI节点建立开发产品的PDT. 正常PDT解散时间在产品正式生产开始(SOP)。 Future Product Program PDT should be established at gate ASI or VPI depending on the Program VDP. Normally, PDT f

文档评论(0)

youngyu0329 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档