- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PLC电梯控制英文文献五千字翻译(适用于本科毕业设计)培训资料.ppt
1;2.5 System Block Diagram
A Programmable Controller is a specialized computer.Since it is a computer, it has all the
basic component parts that any other computer has; a Central Processing Unit,Memory, Input
Interfacing and Output Interfacing.A typical programmable controller block diagram is shown in
Figure 2.5.;3;is input/output updating, it is referred to as I/O Update.The updating of discrete input and output
information is accomplished with the use of input and output image registers set aside in the PLC
memory.Each discrete input point has associated with it one bit of an input image
register.Likewise, each discrete output point has one bit of an output image register associated
with it.When I/O updating occurs, each input point that is ON at that time will cause a 1 to be set
at the bit address associated with that particular input.If the input is off, a 0 will be set into the bit
address.Memory in todays PLCs is generally configured in 16 bit words.This means that one;Figure 2.6;the light (coil) has been either turned on or off it will remain in that state until the next time the
PLC solves that particular rung.After solving a rung, the PLC moves on to solve the next rung in
the same manner and so forth until the entire ladder has been executed and solved.One rule that
is different from general electrical operation is the direction of current flow in the rung.In a
ladder logic, rung current can only flow from left to right and up and down; never from right to
left.
As an example, in the ladder shown in Figure 2.7, coil CR1 will energize if any of the
following conditions exist:; At I/O update, the states of all coils which are designated as outputs are transferred from the
output image register to the output unit and the states of all inputs are transferred to the input
image register.Note that any input changes that occur during the solution of the ladder are
ignored because they are only recorded at I/O update time.The state of eac
您可能关注的文档
- p1 通信工程概预算基础知识培训课件方案研究.ppt
- P2P平台如何通过微信推广发展投资用户?培训课件方案研究.ppt
- P2实验室生物安全管理要求知识讲稿.ppt
- P6项目管理软件培训培训课件方案研究.ppt
- PaaS基础平台及服务研究报告.pptx
- Part1 路面设计方法与设计要素案例实例.ppt
- Part5 扩展与重组培训资料.ppt
- PBA工法简介教学讲义.ppt
- PBL3.1 痔疮 各种参考值教材课程.pptx
- PBL讲课稿教程文件.ppt
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)物理试卷(含答案详解).pdf
- 2025年四川省新高考八省适应性联考模拟演练(二)地理试卷(含答案详解).pdf
- 2024年内蒙通辽市中考化学试卷(含答案逐题解析).docx
- 2024年四川省攀枝花市中考化学试卷真题(含答案详解).docx
- (一模)长春市2025届高三质量监测(一)化学试卷(含答案).pdf
- 2024年安徽省高考政治试卷(含答案逐题解析).pdf
- (一模)长春市2025届高三质量监测(一)生物试卷(含答案).pdf
- 2024年湖南省高考政治试卷真题(含答案逐题解析).docx
- 2024年安徽省高考政治试卷(含答案逐题解析).docx
文档评论(0)