- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工业工程外文翻译--装配线平衡问题的求解方法浅析
毕业设计(论文)英文翻译
学生姓名: 蒋伟伟 学 号:
所在学院: 经济与管理学院
专 业: 工业工程
设计(论文)题目:好孩子推车事业部总装线生产线优化设计
指导教师: 蒋南云
2012年4月25号
The Methods for Solving the Problem of Balancing an Assembly Line
Currently, along with the market changing, some forerunners production mode got an extensive application in the manufacturing industry. How raise a whole efficiency of assembling the production line, reduce a work preface in the ware, and pursue to synchronize production is valued by more and more people. The production of manufacturing industry is most likely after carrying on subdividing to turn of have another a work preface flowing water to turn a continuous homework production line, at this time because of division of homework, the time of each work preface operates cant completely the same in theoretically and physically, this phenomenon that certainly will lead to a work preface homework burden unbalance. In addition to losing, result in the meaningless man-hour also result in a great deal of work preface pile up, sometimes will result in the abeyance of production line. Assembly line balance is a kind of means and method for resolving an above-mentioned problem, it is to make all work carry on equally, carrying on a research to the homework, carrying on a measurement to time, making the Assembly line moving smoothly.
The assemble is the last link of production, assembling process mainly with the gearing of parts, tightly solid in lord; secondly allied connect, press to pack and add to note various work to lie quality and quality examination of work preface, sometimes still want to choose to pack according to the customer intention. The whole assemble homework is complicated, belonging to a labor an intensive type engineering. Therefore, the balance of exaltation assembly line has important realistic meaning to exaltations production efficiency of the ca
您可能关注的文档
- 多级负反馈交流放大电路的课程设计.doc
- 大专会计毕业论文--加强成本控制,提高现代企业竞争力.doc
- 大学生宿舍管理系统(聊天室等模块)设计与实现.doc
- 大学生毕业德育论文--大学的成长历程.doc
- 大批量定制条件下产品配置研究及产品选择.doc
- 大气污染治理技术课程设计--某硫化锌矿焙烧烟气除尘系统设计.doc
- 大气污染控制工程课程设计--电除尘器的设计.doc
- 大气污染课程设计--高硫无烟煤烟气袋式除尘湿式脱硫系统设计.doc
- 大气课程设计---某滑石粉生产线除尘系统工艺及高效除尘器的设计.doc
- 天津市北辰区2014年旧楼区提升改造工程十二项区自选项目第二标段(井田公寓1-15#)标段房建施工组织设计(小区改造).doc
最近下载
- 广汽集团公司2010年度财报.pdf
- HEIDENHAIN海德汉TNC640 (34059x-10) Cycle Programming用户手册.pdf
- 2024年机电安装工程行业分析报告及未来五到十年行业发展趋势报告.docx
- 2022年长春市朝阳区工会系统招聘考试试题及答案解析.docx VIP
- 《大数据架构与设计》实践报告-网易云音乐大数据系统构建.docx VIP
- 仓储物流园及配套基础设施项目可行性研究报告-立项备案.doc VIP
- 城乡环卫保洁投标方案.doc
- 2022年1月吉林省长春市工会系统招聘考试《工会基础知识》试卷及答案.pdf VIP
- 2023年上海海洋大学计算机科学与技术专业《计算机网络》科目期末试卷A(有答案).docx VIP
- [高清书籍]威尼斯商人.PDF
文档评论(0)