2座80吨、年产良坯量为174万吨的氧气转炉炼钢车间设计(可编辑).doc

2座80吨、年产良坯量为174万吨的氧气转炉炼钢车间设计(可编辑).doc

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2座80吨、年产良坯量为174万吨的氧气转炉炼钢车间设计(可编辑)

2座80吨、年产良坯量为174万吨的氧气转炉炼钢车间设计 ? Abstract The design for the 2×80 tons, the annual output of 1.7 million tons of oxygen converter steelmaking workshop. The workshop of main systems for: the molten iron supply system, disperses the shape material supply system, scrap steel supply system, the ferroalloy supply system, flue gas purification system, pouring system, refining outside the furnace system, etc. These solutions are determined by comparing and the more reasonable for the design scheme, and adopted the advanced technology. This design includes bof model calculation, oxygen lance calculation, flue gas purification system calculation, the calculation of the workshop equipment and across the arrangement between. In addition, our design has also used the many new technologies such as: by slag splashing furnace technology, the molten iron the desulfurization, slab continuous casting and rolling technology, these technologies have reached the international advanced level. This design has two of the converter, the size of converter are for 80 t, average oxygen blowing time for 38 min, pure oxygen blowing for 15 min, machineries for 79.5% of converter, the main raw material of converter is metal, and scrap steel and other auxiliary materials. Good billet the yield of 99%. In addition, this workshop and refining outside the main thread feeding and vacuum deairing with the means. This workshop for continuous casting of casting way, workshop of the final product for billet. Through the design, whole master steelmaking process flow and workshop process arrangement, the further understanding of the world steel dynamics. Keywords: pretreatment; refining furnace; slab; advanced? 目录 摘 要 I Abstract II 引言 1 1 设计方案的选择确定 2 1.1车间生产规模、转炉容量及座数、产品方案的确定 2 1.1.1车间生产规模及座数的确定: 2 1.1.2产品方案的确定: 3 1.2车间各主要系统所用方案的比较及确定 3 1.2.1 铁水供应系统 3 1.2.2 铁水预处理系统 3 1.2.3废钢供应系统 5 1.2.4 散状料供应系 5 1.2.5铁合金供应系统 7 1.2.6 烟气净化系统 7 1.2.7 炉外精炼系统 9 1.2.8 浇注系统 11 1.2.9 出渣系统 15 1.3 炼钢车间工艺布置 16 1.3.1 车间跨数的确定 16 1.

您可能关注的文档

文档评论(0)

aena45 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档