变频器的主电路如何上电检修(How to check the main circuit of power converter).docVIP

变频器的主电路如何上电检修(How to check the main circuit of power converter).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
变频器的主电路如何上电检修(How to check the main circuit of power converter).doc

变频器的主电路如何上电检修(How to check the main circuit of power converter) How to check the main circuit of power converter for electrical work? The inverter maintenance personnel must set up the idea that the inverter module and the drive circuit have a strong joint on the fault. When the burst module is damaged, the driving circuit is bound to be impacted and damaged; module damage may also is caused by the fault of the driving circuit. Therefore, the inverter output circuit and the drive circuit must be thoroughly inspected whether the drive circuit or the inverter output circuit is faulty. For the main circuit, the electric test machine must be based on the premise that the drive circuit is normal - the normal output of the six way exciting pulse. For the maintenance of the drive circuit, see the fourth chapter of this book. After checking that the drive circuit is normal, the inverter module will be damaged and replaced before it can be put on the electric test machine. The on board tester after assembly is an event that must be carefully considered. Corresponding measures must be taken to ensure that the new IGBT module is not damaged when abnormal conditions occur. When testing the machine, the start-up time of the converter is the most critical moment. Without any protection measures, the fast power on will cause the new expensive modules to be damaged in an instant. Previous efforts to overhaul have not only been wasted, but have caused even greater losses and may have widened the scope of failures. Some maintenance personnel bombed several modules, then the frequency converter maintenance discouraged. Take the corresponding power on test machine measures, can basically put an end to the power test machine inverter module damage, as long as a little more careful, then basically no problem. Method: the power inverter module is disconnected, in fact in the circuit are connected with the copper bars, remove a connecting copper bar, the positive supply is three-phase inve

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档