- 1、本文档共3页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工艺-注塑
Function:To conceive, plan, coordinate, develop, qualify and implement Standard Insert Molding process technology meeting FCI’s cost and capacity objectives against customer requirements. Responsibilities include, but are not limited to all aspects related to the implementation (materials, tooling, equipment), operability and performance of new or existing Molding processes, their modifications and related documentation.Engineering Tasks:
Coordinate project tasks and deadlines in maintaining project schedules and budgets. Solicit internal and external resource support to meet project timelines.
Participate in definition of overall project plan and schedules for development projects in meeting time to market (TTM) objectives.
Act as a consultant to management in assessing project aspects, feasibility and risks and in making technical recommendations for alternatives to achieve objectives against delivery schedules.
Interface with vendors, quality, product engineering and manufacturing to assure capability and/or compliance in meeting process, product, delivery, and safety/environmental objectives.
Coordinate equipment transfer and training of personnel for start-up facilities
Discovery Definition focuses on early involvement with the product/process conceptualization to determine characteristics/requirements that meet product, manufacturing and customer objectives.
Define processes inclusive of process specifications, setup sheets, control charts, operating procedures, spare parts lists and preventative maintenance plans.
Provide input to define siting (facilities), area layout and infrastructure requirements.
Define the process steps and sequence of operations, material handling and process control needs and to the extent possible, the preliminary process layout.
Define process flexibility requirements based on proposed product configurations.
Define the supply chain from raw material to customer application.
Define the process step cycle times, efficiencie
您可能关注的文档
- 富强鑫双色机FB_series_26P.pdf.pdf
- 寓言故事路灯与消防栓-保险培训.ppt.ppt
- 寓言的教学.ppt.ppt
- 寓言故事如何做好一盏 -管人管事管自己.ppt.ppt
- 實驗設計(DOE)於製程與品質改善之應用.ppt
- 对企业班组安全管理的思考.doc
- 对冲交易入门教程.doc
- 对军队会计工作的几点思考.doc
- 对口支援工作.doc
- 对员工的精神激励.doc
- 2024-2030年中国冰箱行业市场深度调研及竞争格局与投资策略研究报告.docx
- 2024-2030年中国冷冻机油行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国军用综合训练环境(STE)解决方案行业现状动态与发展战略研究报告.docx
- 2024-2030年中国农业卫星数据服务行业发展战略与投资规划分析报告.docx
- 2024-2030年中国再生棉纱行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国再生铝行业创新状况与未来营销趋势预测研究报告.docx
- 2024-2030年中国六羰基钨行业发展动态与产销需求预测报告.docx
- 2024-2030年中国公共资源交易行业运行监测分析及发展对策建议研究报告.docx
- 2024-2030年中国全棉尿布行业需求规模及投资风险剖析研究报告.docx
- 2024-2030年中国光芯片行业供需状况与前景趋势研究研究报告.docx
文档评论(0)