- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
案例分析用短壁开采的方式来回收煤柱毕业论文外文翻译
英文原文
Exploitation of developed coal mine
pillars by shortwall mining—a case example
A. Kushwaha, G. Banerjee
Central Mining Research Institute, Barwa Road, Dhanbad 826001, Jharkhand, India
Abstract: The shortwall mining technique is similar to longwall mining but with shorter face lengths, ranging between 40 and 90m, with the aim of controlling the caving nature of the overlying upper strata, the load on support and the overall operation of the supports applied at the face. Field observations and three-dimensional numerical modelling studies have been conducted for the longwall panel extraction of the Passang seam at Balrampur Mine of SECL to understand the caving behavior of the overlying upper strata. A large area of the Passang seam adjacent to the longwall panels has already been developed via bord and pillar workings. In this paper, numerical modelling studies have been conducted to assess the cavability of the overlying strata of the Passang seam in the mine over developed bord and pillar workings along with the support requirement at the face and in the advance gallery. The caving nature of the overlying rocks characterized by the main fall is predicted for varying face lengths, strata condition and depths of cover. The support resistance required at the face, the load in the advance gallery and its optimal obliquity were estimated for faster exploitation of the developed pillars in the Balrampur mine by shortwall mining.
Keywords: Exploitation; Shortwall mining; Geo-mining; Obliquity; Block contours; Main fall; Advance gallery
1. Introduction
In India, underground coal production is mostly dependent upon the conventional bord and pillar (room and pillar) method of mining, although the overall output per man shift (OMS) through this method is generally not more than 1 ton in any of the mines [1]. Large areas in all the subsidiaries of Coal India Limited and even in Singarani Coal Companies Limited (India) have been developed via bord and pillar workings. Th
您可能关注的文档
- 浅谈“小学学课教学中实验能力”的培养.doc
- 浅谈《综合德语课》基础阶段自主堂的构建.doc
- 浅谈《综合德语课》础阶段自主课堂的构建.docx
- 浅论英语广告的语言特征及翻译巧毕业论文.docx
- 浅谈《水浒传的爱国思想.doc
- 浅谈三年英语入门.doc
- 浅谈《金属的腐蚀与防护教学思路及感想.docx
- 浅谈中国企业跨并购现状及模型.docx
- 浅论自我效能与优英语自主学习.doc
- 浅谈《计算机组装与维护实训课程教学与实践应用.docx
- 2025年小学英语毕业考试模拟试卷(英语写作方法2025剖析).docx
- 2025年辽宁省锦州市义县高三下学期4月联考物理试卷.docx
- 2025年辽宁省锦州市义县高三一模物理试卷及答案.docx
- 2025年注册建筑师专业知识考核试卷:建筑景观与城市设计试题.docx
- 2025年辽宁省锦州市义县高三下学期3月联考物理试卷.docx
- 江苏省镇江市联考2025届毕业升学考试模拟卷历史卷含解析.doc
- 2025年护士执业资格考试:急危重症护理学专项护理心理素质试题.docx
- 儿童健康教育的多媒体课程设计与认知效果研究.pptx
- 产品质量管理体系优化与实施策略.docx
- 2025年辽宁省铁岭市银州区高三二模物理试卷及答案.docx
文档评论(0)