一级建造师模拟试题-市政工程(a)(First class constructor simulation test - Municipal Engineering (a)).docVIP

一级建造师模拟试题-市政工程(a)(First class constructor simulation test - Municipal Engineering (a)).doc

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建造师模拟试题-市政工程(a)(First class constructor simulation test - Municipal Engineering (a)).doc

一级建造师模拟试题-市政工程(a)(First class constructor simulation test - Municipal Engineering (a)) First class constructor simulation test - Municipal Engineering (A) Single choice question ? 1. In the following road surface type, () is the advanced road surface. ? A and asphalt are poured into the broken (gravel) stone road surface ? B, road mixed asphalt macadam pavement ? C, mud broken (gravel) stone road surface ? D, cement concrete pavement ? 2, strength test under the test pressure (min) no leakage, no pressure drop down to the design pressure, constant pressure (min) check no leakage, no abnormal sound, no pressure drop qualified. ? A, 10; 30 ? B, 15; 60 ? C, 10; 60 ? D, 15; 30 ? 3. Flanges are usually used to check the verticality of flanges when they are assembled with flanges. ??? A, Bob ? B, flange bending ruler ? C, level ruler ?? D, calipers ?? 4. The porosity of soil refers to (). ? A, the ratio of pore volume to particle volume of soil B? The ratio of pore volume of soil to volume of soil (three phases) ? C, the volume of soil water and the volume ratio of soil particles D, the volume of soil water and the volume of soil (three phases) ? 5. Grouting methods include synchronous grouting and grouting behind walls. The main basis for choosing grouting method is (). ?? A, geological conditions ?? B, water level conditions ? C, tunnel waterproof requirements ?? D, formation deformation requirements ? 6. The facilities used to regulate and stabilize the pressure of the pipe network in the city gas pipeline network. ? A, storage and distribution station ??? B, station ? C, gas station ? D, distribution station ? 7. The cracks in mass concrete are classified according to the depth. ?? A, 2 ?? B, 3 ?? C, 4 ?? D, 5 ? 8. When using hand dug pipe jacking, the groundwater level should be less than (less than) below the pipe bottom, and measures should be taken to prevent other water sources from entering the pipe jacking pipe. ?? A, 0.5m ?? B, 2m ?? C, 1.0m ?? D, 1.5m 9. In t

文档评论(0)

zhangningclb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档