- 1、本文档共13页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
河南科技学院新科学院
2012届本科毕业论文
中英文翻译
学生姓名:
所在院系:
所学专业:
导师姓名:
完成时间: 2012年5月10日
Based on single-chip microcomputer control elevator voice station reporting device
Key words: SCM ISD4004voice station reporting device
1 Introduction
The modern building scale is larger and larger, more and more high on the floor, the elevator technical and quality requirements are also getting higher and higher. Modern elevator technology has been towards faster, more stable, more secure, more humane direction of rapid development.
Elevator voice station reporting device is the embodiment of the humanized design of a specific performance. The elevator will be reported by voice or has reached the floor information, the running state of the elevator, welcome speech and music, can avoid wrong elevator passengers or floor, elimination of people take the elevator to the loneliness.
2 hardware circuit design
The system consists of signal acquisition and isolating circuit, SCM and its peripheral circuit, a speech chip circuit composed of three parts. The elevator floor after signal acquisition isolation after treatment sent to single-chip, single-chip analysis, judgment, extract the effective information, and then by processing output signals to control a speech chip circuit real-time broadcast.
A 2.1 signal acquisition and separation circuit
The newspaper station implement work needs to collect some relevant information to the operation of the elevator, elevator security requires additional system on elevator does not generate interference, the signal acquisition and isolation work is very important.
The system used the elevator control panel on each floor button, elevator flat-layer signal and switch signal, as shown in table 1:
Table 1the elevator control signal
Considering the signal voltage levels is not a, for the collection of signals required by different treatment. Experiments show that, when the collection circuit i
您可能关注的文档
- 高层防火毕业论文.doc.doc
- 高层商业住宅楼开题报告.doc
- 高层建筑给水排水系统毕业设计.doc
- 高层建筑框架设计计算书.doc
- 高层课程设计--现浇钢筋混凝土框架结构办公楼.doc
- 甘肃省张掖市甘州区甘肃石岗墩开发区前进牧业科技有限责任公司3万头 奶肉牛养殖示范基地建设项目(涉及奶牛养殖、育肥、饲料加工、粪便污水处理)报告书全本.doc
- 甘肃省张掖市甘肃丹霞红枣业有限责任公司750吨红枣加工项目.doc
- 甘肃省张掖市甘肃库班燃气安装有限公司临泽县城市管道天然气输配工程.doc
- 甘肃省张掖市甘肃途辉沥青有限公司4500吨乳化沥青加工项目.doc
- 甘肃省白银市久联民爆器材有限公司现场混装车及地面辅助设施项目报告表.doc
文档评论(0)