- 1、本文档共93页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程毕业的设计——预应力简支空心板桥梁
新宇大桥设计
学 院:建筑工程学院
专 业 班 级:
学 号:学 生 姓 名:指 导 教 师:
2013 年 6 月是级公路上的一座桥梁,单跨米,此设计分为上部结构设计和下部结构设计两大部分。上部结构设计中,首先确定桥的类型,构造的设计,梁板布置的选择和定位,本桥采用的是装配式预应力混凝土简支空心板梁桥,其次根据已定的结构设计和计算配筋。其中包括截面尺寸,计算简图的确定,计算方法,荷载计算,内力计算并绘制内力图,影响线下部结构设计中,确定为,进行了基础的验算,满足了设计要求。最后使用CAD制图将所设计的构造和配筋进行施工说明。关键词:
Abstract
Bridge is a road traffic in the important part. Economically, the cost of bridges and culverts, roads generally accounted for an average total cost of 10% -20%, especially in the modern highway and the city in the construction of viaducts, bridges not only on the size of the project is huge, but also is often the key to ensure that the opening line of the early Universe Bridge is through three specific programs meet the elected election, economy, structure size, structure, construction, aesthetic requirements to make several options, and finally through the technical, economic and other aspects of the comprehensive comparative optimal design is a secondary road on a simply supported prestressed hollow slab bridge, a single span of 15 meters, hollow section can not only reduce weight but also make good use of materials
This design is divided into upper and lower structural design structural design of two parts.
Superstructure design, first determine the type of bridge, structural design, the choice of slab layout and positioning, the bridge uses a prefabricated prestressed concrete hollow slab bridge, followed by the structure has been set according to the design and calculation of the assigned tendons. Including cross-sectional dimension, calculation diagram to determine, calculation method, load calculation, force calculation and draw force diagram, affecting lines. Some structural requirements for checking a series of classes to determine the feasibility of the structure, if the calculation failed to redesign
Substructure design, identified as gravity piers, pier caps and carried out the design of pier, there were basic checking, to meet the design requirements. Finally d
您可能关注的文档
最近下载
- 新人教版数学五年级上册全册各单元教材解读课件.pptx VIP
- 译林-英语-四年级上册-期中测试卷-10套.docx VIP
- 黑布林阅读初三16《雾都孤儿》中文版.docx
- 网络传播概论(第5版)课件 第3、4章 网络传播形式的流变、网络传播的多重策略.pptx
- 常见口腔疾病的用药指导及诊疗指南解读答案-2024年执业药师继续教育.docx VIP
- (2024秋)部编版一年级语文上册《 两件宝》教学设计.docx VIP
- 初中九年级(初三)化学课件 氢气的实验室制法.ppt VIP
- 圆锥曲线二级结论.docx VIP
- 译林版四年级上册英语单元测试卷、月考试卷、期中、期末试卷(含答案)sc.doc VIP
- 2024年中级经济师《运输经济》试题及答案.docx VIP
文档评论(0)