- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文翻译 中小型循环流化床锅炉点火运行技术
文献阅读及译文
Small circulating fluidized bed boiler technology ignition run
Abstract:To introduce an economic, strong and the vessels of the boiler, the technology the process of law and experience.
Keywords :The boiler the technology cycle vessels
1 foreword
The vessels one cycle of a boiler is a burning efficient, adaptable, to change to heat loading, the scope of such emissions, but in the process of implementation of the case of nitrogen, environmental requirements to take off the fire the boiler. at present, in the small and medium-sized heating or production of the boiler(ten tons of~seventy five ton)the widespread adoption of the stove, Parts new, or the reform of the circulation of vessels, quite a number of personnel for operation of vessels of the running so the technology and economy is a better and better attuned to the small and medium-sized the vessels of the operation of the technology, combined with wood taiyuan boiler plant type of vessels hot water runs by the technology for this.
2 the operation of the technical
2.1 the preparation of various
For new, or overhauling of the cycle of vessels, when the boiler pressure test of boilers and the furnace to boil over and the inmates are allowed to pass and have the run. in the running up before the preparations have been covered against :coal, coal, the electrical and control system that the boilers in the water, the army and the valve is opened, the cycle pump has to run the normal, all the preparatory work is complete with the operating conditions.
Ready enough some matches, there are mainly:the(with wood is best pear trees and the hard wood and assorted wood)200kg, wood is in 30~50mm length between the two~300mm, there is no iron and wood ;the things in bulk 85~100kg in diameter, 20~40mm.
The boiler the fluidized bed with the base chosen not to boil water or damp(better is the circulation of the vessels of boilers), granularity for5~10mm between the number for use by subtracting 5and 10by 10mm to the ba
文档评论(0)