外文翻译波特兰水泥原料准备.docxVIP

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文翻译波特兰水泥原料准备

外文资料翻译Portland Cement Preparation of Raw Materials1. Crushing The raw materials as received from the mines are in lump form and have to be crushed before fine grinding. The size of the lumps would depend upon theraw material and the method of mining, so the size of the crushing equipmentused would depend primarily upon the size of the lumps received. In a moderncement factory, manufacturing 1000 to 2000 tonnes of cement per day, the limestone is mined by mechanical means and hence the size of individual pieces maybe 1 meter or so. In smaller factories, the mining of limestone may be manualand the size of individual pieces may be 200 mm or so. Similarly, clay, shale,bauxite, laterite, sandstone, coal, gypsum, etc. may be received in sizes notlarger than 300 mm.(a) Limestone Crushers: The requirement of limestone per day for a 2000TPD factory may be about 2600 to 3000 TPD, for a 1000 TPD factory 1300 to1500 TPD and for a 300 TPD factory 400 to 450 TPD. As the mining operationhas to be carried out in daylight hours only, the crushing operation should alsobe carried out in the 10 or 12 hours of light per day. The capacityof a limestone crusher for a 2000 TPD factory may be 300 TPH, for a 1000 TPD factory 150 TPH and for a 300 TPD factory 50 TPH. The decision on the type of limestonecrusher would depend upon the physical properties of the limestone; however,for smaller factories using manually mined limestone, single stage HammerCrushers are most suitable; but for larger factories two stage crushing is alwaysmore economical and more efficient. The first stage may be a Jaw Crusher, Gyratory Crusher or Impact Crusher and the second stage a Hammer Crusher orCone Crusher. If possible, a screen of suitable size may be introduced after thesecondary crusher to allow only undersize to go for further processing whileoversize is returned to the crusher. A typical flowsheet for a limestone crushingplant in a 2000 TPD factory may be.Dumpers--Feed Hopper with Laminated conveyor at t

文档评论(0)

bokegood + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档