网站大量收购独家精品文档,联系QQ:2885784924

FIDIC信函范例一往来.doc

  1. 1、本文档共204页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FIDIC信函范例一往来.doc

SPECIMEN LETTERS Section Clause LETTER D Appointment of Named Engineer – to Named Engineer 3.1.2 2(2)(a) LETTER D1 Appointment of Named Engineer – to Contractor 3.1.2 2(2)(a) LETTER D2 Appointment of Named Engineer – to Employer 3.1.3 2(2)(a) LETTER D3 Replacement of Named Engineer – to Contractor 3.1.4 2(2)(b) LETTER E Appointment of ER – to Contractor 3.3.2 2(3)(a) LETTER E1 Temporary ER – to Contractor 3.3.3 2(3)(a) LETTER E2 Replacement ER – to Contractor 3.3.3 2(3)(a) LETTER F Duties Delegated to ER – to ER 3.4.2 2(4) LETTER F1 Duties Delegated to ER – to Contractor/Employer 3.4.3 2(4)(a) LETTER F2 Amendment to Delegated Duties – to ER 3.4.4 2(4)(a) LETTER F3 Amendment to Delegated Duties – to Contractor/Employer 3.4.4 2(4)(a) LETTER F4 Advice to ER – Clause 14(6) only – Contractor’s Proposals 3.4.5 14(6) LETTER F5 Advice to ER – Clause 14(6) and Clause 14(7) 3.4.5 14(6) (7) LETTER F5A ER’s letter – consenting to Contractor’s Proposals 3.4.5 14(6) (7) LETTER F5B ER’s letter – withholding consent 3.4.5 14(6) (7) LETTER F6 Advice to ER – Clauses 51(1) and 58(1) – Variations 3.4.5 51(1) 58(1) LETTER G Assistant to ER (One only) – to Contractor 3.5.3 2(5)(a) LETTER G1 Assistant to ER (More than One) – to Contractor 3.5.3 2(5)(a) LETTER G2 Deputy ER – to Contractor 3.5.4 2(5)(a) LETTER G3 Inspector – to Inspector 3.5.5 2(5)(a) LETTER G4 Inspector – to Contractor 3.5.5 2(5)(a) LETTER G5 Change of Assistant to ER – to Contractor 3.5.6 2(5)(a) LETTER G6 Departure of Assistant to ER – to Contractor 3.5.6 2(5)(a) LETTER H Appointment of Subcontractor – to Contractor 4.1.3 4(2) LETTER H1 Removal of Subcontractor – Warning – to Contractor 4.2.2 4(5) LETTER H2 Removal of Subcontractor – to Contractor 4.2.2 4(5) LETTER I Contractor’s Design – Approval of 5.3.2 7(6) LETTER J Contractor’s Programme – Reminder of Requirement for 6.5.2 14(1)(a) LETTER J1 Contractor’s Programme – Reminder of Obligation to Provide 6.5.3 14(1)(a) LETTER J2 Programme – Request for m

文档评论(0)

zhangningclb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档