Construction Engineering
Abstract: Construction engineering is a specialized branch of civil engineering concerned with the planning, execution, and control of construction operations for such projects as highways, buildings, dams, airports, and utility lines. Planning consists of scheduling the work to be done and selecting the most suitable construction methods and equipment for the project. Execution requires the timely mobilization of all drawings, layouts, and materials on the job to prevent delays to the work. Control consists of analyzing progress and cost to ensure that the project will be done on schedule and within the estimated cost.
Keywords: planning, Execution, Control, Preparation of site, Earthmoving, Foundation treatment, Steel erection, Concrete construction, Asphalt paving and so on.
Construction engineering is a specialized branch of civil engineering concerned with the planning, execution, and control of construction operations for such projects as highways, buildings, dams, airports, and utility lines.
Planning consists of scheduling the work to be done and selecting the most suitable construction methods and equipment for the project. Execution requires the timely mobilization of all drawings, layouts, and materials on the job to prevent delays to the work. Control consists of analyzing progress and cost to ensure that the project will be done on schedule and within the estimated cost.
Planning. The planning phase starts with a detailed study of construction plans and specifications. From this study a list of all items of work is prepared, and related items are then grouped together for listing on a master schedule. A sequence of construction and the time to be allotted for each item is then indicated. The method of operation and the equipment to be used for the individual work items are selected to satisfy the schedule and the character of the project at the lowest possible cost.
The amount of time allotted for a certain operation and the s