- 1、本文档共58页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
暖通空调专业-毕业设计毕业论文-
北京市某综合楼空调系统设计方案
摘 要
本设计是北京市某综合楼的空调系统设计。此建筑是包括超市、会议室、办公室、客房等于一身的多功能型建筑,总建筑面积为11732.3m2,建筑高度为15.3m,建筑共五层,地上四层,地下一层。制冷机房设在地下一层,冷却塔布置在四层屋面。一层主要为超市和旅馆大堂,二、三、四层主要是会议室,办公室和旅馆。此次暖通空调设计 空调系统 冷却水系统
The comprehensive design plan of
air-conditioning system in Beijing
Abstract
The graduation design
comprehensive building square meters. The height of the building is 15.3 meters. There are five floors in the building, among them, four floors are on the ground, and one is underground. The generation room of refrigeration system is set up in the basement. The cooling tower is fixed up on the roof of the fourth floor. The supermarkets and the lobby of the hotal are the main room in the first floor. The meeting rooms, offices and the hotal are on the second, third and fourth floors. The content of the heating, ventilation and air-conditioning system design include: central air-conditioning system(include the selection of the cooling and heating source), cooling water of air-conditioning system, prevent and get rid of the smoke in the basement and ventilation system. The complet air system is adopted mainly in the rooms, whose height is more higher and the space is more spacious. And PAU and FCU system is adopted in the other rooms. At last, the measurements of weaken sound, prevent equipment from vibration and insulation are adopted to the equipment of the air-conditioning system and pipeline.
Keyword: comprehensive building; air-conditioning system; cooling water system.
目 录
1 绪论 ............................................... 错误!未定义书签。
1.1设计目的 ...................................... 错误!未定义书签。
1.2设计要求 ...................................... 错误!未定义书签。
1.2.1初步设计 ................................ 错误!未定义书签。
1.2.2施工图设计 .............................. 错误!未定义书签。
1.2.2.1设计计算 .............................. 错误!未定义书签。 1.2.2.2绘图错误!未定义书签。
1.3设计研究现状和发展趋势
2 工程概况和原始资料 .................................................. 1 2.1工程概况 ....................................................... 1
文档评论(0)