- 1、本文档共49页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
BIM与资产管理介绍(FM).ppt
* * * * * * * * * * * * * AIA E202- BIM Protocol Exhibit Protocols Coordination and Conflicts Model Ownership Requirements File Formats Responsibilities Cost Estimating Scheduling Level of Development (LOD)-defines content requirements and authorized use(s) Level 100-”used for understanding the requirements ” (Programming) Level 200-”elements modeled as generalized assemblies” (Schematic Design) Level 300- “elements modeled as specific assemblies” (Construction Documents) Level 400-”fabrication, assembly and detailing information (Construction) Level 500 -”elements modeled as constructed” (OM) Communication Every one in different silos Integrated Project Delivery Owner Designer Contractor BIMStorm BIMStorm LA 24 hour period 133 designers 11 countries Online charrette 55 million SF IFC - Industry Foundation Class * NMT-Kelly Hall Los Alamos National Bank Santa Fe Los Alamos National Bank Santa Fe Cost analysis Energy analysis Paperless submittals System coordination IBL –Sandia National Laboratory Facility Management Facility Management Facility Data that Could Be Included in BIM Planning scenarios and site information Architectural Program Floor plans Space Functions Classified areas, vaults etc. Area calculations Specifications Contract documents Legal description Change orders Supporting documentation for litigation Shop drawings Procurement documents Progress photographs Alarm diagrams Warranty data Cost Estimates Invoices Purchases requests Organizational occupants Personnel lists Seating plans Handicap designation Network diagrams Hazardous materials Operating manuals Maintenance records Inspection records Electronic 3d model Simulations Continuation of operations plan Disaster Recovery Plans Contingency plans Furniture inventory AIA E202- BIM Protocol Exhibit Level of Development Level 100- (Programming) Level 200- (Schematic Design) Level 300- (Construction Documents) Level 400- (Construction) Level 500 -(As-builts) BIM Execution Plan Set clear
您可能关注的文档
- 8抗生素教学教材.ppt
- 8插胃管术教程教案.ppt
- 8月份(交流学习课件《防御性驾驶技术知识》).pptx
- 8月手卫生小讲课教程文件.ppt
- 8环境中有害物质对人类遗传影响幻灯片教学.ppt
- 8相关护理伦理实践各论.ppt
- 8第8课 自命题作文教学教材.ppt
- 8胃溃疡与之身心医学.ppt
- 8陶艺第7课:小鸟罐子讲解材料.ppt
- 9 卤代烃(习题解答)教学教材.ppt
- 2024至2030年中国羚羊角类饮片行业深度调查与前景预测分析报告.docx
- 重庆市面向中国农业大学定向选调2024届大学毕业生2024年国家公务员考试考试大纲历年真题14笔试历.docx
- 重庆市面向西北工业大学定向选调2024届大学毕业生00笔试历年典型考题及解题思路附答案详解.docx
- 中国不动杆菌感染治疗药行业市场现状分析及竞争格局与投资发展研究报告2024-2029版.docx
- 2024至2030年全球与中国ETL软件市场现状及未来发展趋势.docx
- 初中八年级(初二)生物下册期末考试1含答案解析.docx
- 干簧式继电器项目申请报告.docx
- 2024至2030年中国左氧氟沙星片行业深度调查与前景预测分析报告.docx
- 菜籽项目申请报告.docx
- 2024至2030年中国八角钢行业深度调查与前景预测分析报告.docx
文档评论(0)