BIM与资产管理介绍(FM).ppt

  1. 1、本文档共49页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
BIM与资产管理介绍(FM).ppt

* * * * * * * * * * * * * AIA E202- BIM Protocol Exhibit Protocols Coordination and Conflicts Model Ownership Requirements File Formats Responsibilities Cost Estimating Scheduling Level of Development (LOD)-defines content requirements and authorized use(s) Level 100-”used for understanding the requirements ” (Programming) Level 200-”elements modeled as generalized assemblies” (Schematic Design) Level 300- “elements modeled as specific assemblies” (Construction Documents) Level 400-”fabrication, assembly and detailing information (Construction) Level 500 -”elements modeled as constructed” (OM) Communication Every one in different silos Integrated Project Delivery Owner Designer Contractor BIMStorm BIMStorm LA 24 hour period 133 designers 11 countries Online charrette 55 million SF IFC - Industry Foundation Class * NMT-Kelly Hall Los Alamos National Bank Santa Fe Los Alamos National Bank Santa Fe Cost analysis Energy analysis Paperless submittals System coordination IBL –Sandia National Laboratory Facility Management Facility Management Facility Data that Could Be Included in BIM Planning scenarios and site information Architectural Program Floor plans Space Functions Classified areas, vaults etc. Area calculations Specifications Contract documents Legal description Change orders Supporting documentation for litigation Shop drawings Procurement documents Progress photographs Alarm diagrams Warranty data Cost Estimates Invoices Purchases requests Organizational occupants Personnel lists Seating plans Handicap designation Network diagrams Hazardous materials Operating manuals Maintenance records Inspection records Electronic 3d model Simulations Continuation of operations plan Disaster Recovery Plans Contingency plans Furniture inventory AIA E202- BIM Protocol Exhibit Level of Development Level 100- (Programming) Level 200- (Schematic Design) Level 300- (Construction Documents) Level 400- (Construction) Level 500 -(As-builts) BIM Execution Plan Set clear

文档评论(0)

yuzongxu123 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档