85中山市大涌镇污水收集系统85 Zhngshan city in the twn f sewage cectin system.doc

85中山市大涌镇污水收集系统85 Zhngshan city in the twn f sewage cectin system.doc

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
85中山市大涌镇污水收集系统85 Zhngshan city in the twn f sewage cectin system

85-中山市大涌镇污水收集系统(85- Zhongshan city in the town of sewage collection system) Zhongshan city in the town of sewage collection system - Ji Wei yong, An Chung Chung, Arashi Dayu, South Village sewage interception pipeline project Construction bidding compliance preliminary document Tender: Zhongshan city in the town sewage treatment Co. Ltd. Tendering agency: Zhongshan Construction Supervision Co., Ltd. Time: June 19, 2008 Catalog 1. Prequalification notice 2. Requirements for prequalification of bid applicants 3. Application for Prequalification 4. Form of conformity prequalification letter of acceptance 1. Prequalification notice 1, Zhongshan city in the town sewage treatment Co. Ltd. for the tender units of Zhongshan city in the town of sewage collection system based on Tong Wei Chung, Chung, Arashi Dayu, Nan Yong sewage interception pipeline project, has completed the design drawings and bill of quantities of construction work, with the bidding conditions. It is decided to make public bidding for the project construction and select the contractor. 2. The general situation of the bidding project is as follows: (1) overview of the project: this project is the town sewage treatment plant collection system based on Tong Chung, Chung Wei, Lan Tian Yong, Chung Village sewage interception pipeline project, the standard amount is 0.48L/s.ha, interception ratio: n0=1, drainage system for intercepting combined rainwater overflow into the confluence respectively Ji Wei Chung, ANN Arashi Dayu, Tang Chung, Chung Village, sewage into the design of D1200 New Road sewage main pipe, eventually sent to Tai Chung sewage treatment plant. (2) the content of the tender by the Zhongshan city planning and Design Institute of the 2008.05 design the town sewage treatment plant collection system based on Tong Mei Chung, Chung, Arashi Dayu, Yong Nan Cun work drawings and data interception pipeline project of express or implied, are the contents of the tender. Mainly includes: road constructio

您可能关注的文档

文档评论(0)

beoes + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档