外文翻译--摊铺机的熨平板(适用于毕业论文外文翻译+中英文对照).docVIP

外文翻译--摊铺机的熨平板(适用于毕业论文外文翻译+中英文对照).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Paver screed 1.1 Function Fulfilled by the Screed The screed, the road paver‘s working tool, fulfils the function of uniformly compacting the paving material across the entire pave width and producing a close-textured and level surface. The screed‘s compacting systems shall pre-compact the mix to the greatest possible extent. This is to minimize the influence of layer thickness upon the amount of subsequent compaction by rolling when bringing about the pavement’s final density. For pre-compaction, different compacting systems are available: T = Tamper (an eccentric shaft causes the tamper bar to move up and down) V = Vibrators (vibrations are generated by an eccentric shaft acting on the screed plates at right angles to the direction of motion) P = Pressure Bar(s) (the pressure bar(s) are hydraulically pressed onto the mix at a frequency of 68 Hz (approx.) and a maximum pressure of 130 bar) P1 = Screed equipped with 1 Pressure Bar P2 = Screed equipped with 2 Pressure Bar 1.2 Extending Screeds and Bolt-on Extensions For all VOGELE screeds, bolt-on extensions are available. The VOGELE system of bolt-on extensions allows to easily and sturdily build up screeds to any pave width desired. Even when paving in large widths, VOGELE screeds work with highest precision and achieve superb degrees of uniform density right up to the pavement edges. When fitting bolt-on extensions, care must be taken to ensure that the bottom edge of the screed plate is flush with the adjacent units, otherwise a step may be produced in the pavement or the screed planning angle may change. During the paving process, this can have a negative effect on pre-compaction, surface structure and floating behaviour of the screed. 1.3 Set-Up of the Extending Screed 1. Position both extending units in place so that the screed plate of the basic unit and the screed plates of the extending units are roughly level. 2. Slacken the chains connecting the spindles on the extending unit so that each spindle can be a

您可能关注的文档

文档评论(0)

秦圈圈 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档