[定稿]毕业论文日产120吨天然矿泉水厂的设计.doc

[定稿]毕业论文日产120吨天然矿泉水厂的设计.doc

  1. 1、本文档共34页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
[定稿]毕业论文日产120吨天然矿泉水厂的设计

日产120吨天然矿泉水厂的设计 摘  要 本设计为日产120吨天然矿泉水厂的设计,设计包括可以同时生产桶装水和瓶装水。并对产品生产方案的制定,生产工艺的设计,车间平面布置的安排进行了详细的讨论,利用AutoCAD制作出车间的生产工艺流程图和平面布置图;以及对矿泉水加工过程中物料平衡、热量平衡进行计算,设备选型,水电汽平衡,劳动力平衡,设定企业管理组织架构,实施环境保护规划并进行污水处理,对投资成本、利润和回收期等进行估算。设计采用倒班制,分为两个班组进行生产,每天工作16小时,每班工作8小时。根据设备生产能力确定每天生产瓶装矿泉水51.74吨,生产桶装矿泉水72.87吨;每班每天生产瓶装水25.87吨,生产45454瓶;每班每天生产桶装水36.43吨,生产1851桶。本投资预计1800万元,年利润850.82万元,回收期大约为两年零两个月。 关键词:天然矿泉水厂;生产工艺设计;平面布置;经济技术分析 The design of a plant with processing 120 tons mineral water Abstract The design was the daily production of 120 tons of natural mineral water plant, and this also included the production of barreled water and bottled water. The design discussed the production plan, production process, workshop layout arrangement in detail, produced workshop production process flow diagram and layout by using AutoCAD; as well as calculated material balance, heat balance in the process of the mineral water , set the enterprise management structure by the equipment selection, water vapor equilibrium, labor force balance , the implementation plan for environmental protection and sewage treatment, and estimated the investment cost, profit and the recovery period. This factory used a shift system, divided into two groups for the production, working time was 16 hours a day, and each class was 8 hours. According to the production capacity of equipment, determining the daily production of bottled mineral water was 51.74 tons, the production of barreled mineral water was 72.87 tons. Each class daily production of bottled water was 25.87 tons, and produced 45454 bottles per day, the same time the production of barreled water was 36.43tons, produced 1851 barrels a day. The investment of the project was RMYuan, profit was 8508200 Yuan, and recovery period of it was about2.2years. Keywords: Natural mineral water factory; Process design; Layout; Technical and economic analysis. 目  录 TOC \o 1-3 \h \z \u HYPERLINK \l _Toc325292238 摘  要 PAGEREF _Toc325292238 \h I HYPERLINK \l _To

文档评论(0)

beoes + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档