Gulf Coast公司宣传演示1.ppt

  1. 1、本文档共37页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Gulf Coast公司宣传演示1.ppt

GCP Market Area A Unique Structural Member Quality Control High Strength Concrete High Density Concrete Low Porosity Concrete Uniformity of Concrete Uniform Wall Thickness Design Variations Length Adjustments Maximum Combined-Load Strength Corrosion Resistance Manufacturing Process Moving Segments to Storage Assembly Tensioning Prestressing Strands Tensioning Complete Stress Transfer Transportation Grouting Cylinder Piles Being Loaded on Barges Questions? Please Contact Don Theobald at dtheobald@ GCP occupies approximately 90 acres on the Industrial Seaway in Pass Christian on the Gulf Coast of Mississippi. We supply products from Houston, Tx to Apalachicola, Fl. From September of 1999 through August 2000 we have produced 179,650 LF of 12” square pile 613,636 LF of 14” square pile 305,703 LF of 16” square pile These three sizes account for 208 miles of pile. Assembled Form ready for spinning A spiral steel reinforcing cage is fabricated for each section. A completed spiral cage. Steel rods are attached to the end rings. Special rubber hose cover the rods to form the 1 3/8” ok In 1965 Hurricane Betsy destroyed cylinder piles installed in 1950 in Gulf of Mexico in . This Photo was taken in 1968. Close-up of damaged pile shows that corrosion did not progress beyond concrete fracture line for both prestressing tendon and spiral. Assembled Form being placed into pile spinner. Form in Spinner An operator moves the Charger with concrete hopper and auger attached in and out of the slow spinning form depositing the “0” slump concrete. External Vibrators are utilized against the form while a roller compactor is used to screed toe pile to a uniform thickness against the end rings. * * Manufacture of Spun Cast Concrete Cylinder Piles by Don Theobald Vice President / Engineering Gulf Coast Pre-Stress, Inc Precast/Prestressed Concrete -- The Solution of Choice GCP Plant Facilities Welding Spiral Cage Completed Spiral Cage End Rings 54 i

文档评论(0)

zzqky + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档