- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
-
案例分析参考答案
第7章 案例分析? Underwater Chaos
1. What’s your reaction to this story? What does it illustrate about decision making?
With the vast sums of money invested into large projects like the Eurotunnel (approximately £9.5bn), it amazes observers that important information (i.e. the affect of the cold weather) would not be considered beforehand.? However, this situation is fairly common in projects that use groundbreaking technologies in extreme environments.? ?These types of projects occur under conditions of uncertainty and great risk.? It is common for these projects to experience unexpected ‘hiccups.’ The best case scenario in these types of projects is to plan as to avoid life threatening catastrophes and to have contingencies plans in case of emergencies.
?
2. How could the decision-making process have helped in both the response to the crisis situation and in preventing it from happening?
Better planning is always suggested after the fact.? Consideration of the effects of extreme weather could have been made part of the testing of the train and track equipment before it was put into use. While the situation was developing, emergency plans should have been in place to deal with a possible breakdown and better communication equipment made available.? Eurostar should have been clued into possible problems when other forms of transportation broke down during the extreme weather.? It is important to note that Eurostar did take the necessary actions after the incident to correct communication problems and retrofit train equipment.
?
3. Could procedures, policies, and rules play any role in future crisis situations like this one? If so, how? If not, why not?
Students may not be aware that most companies have plans for dealing with emergencies. Airlines are a good example of firms that practice risk management.? ?These firms develop contingency plans for minor and worse case scenarios.? Employees are trained in how to handle emergencies and backup/emergency equipment
您可能关注的文档
- 个案急救护理-【完整版】.doc
- 葛坳220kV变电站新建工程计划施工组织计划2017.doc
- 个人求职申请报告.doc
- 各大跨境电子商务平台开发接口(必威体育精装版~).doc
- 各国货币代码表(CurrencyCode~).doc
- 各疾病护理-流程图.doc
- 各种疾病护理-常规.doc
- 各种普法工作会议记录资料.doc
- 各种礼仪礼貌训练培养资料.doc
- 给排水施工计划组织.doc
- 教科版(2017秋)科学二年级上册2.6 做一顶帽子 教学设计.docx
- 河北高频考点专训四 质量守恒定律的应用教学设计---2024-2025学年九年级化学人教版(2024)上册.docx
- 大单元教学【核心素养目标】6.3 24时计时法教学设计 人教版三年级下册.docx
- 河南省商城县李集中学2023-2024学年下学期九年级历史中考模拟八(讲评教学设计).docx
- 第18章 第25课时 正方形的性质2023-2024学年八年级下册数学课时分层作业教学设计( 人教版).docx
- Module 8 模块测试 教学设计 2024-2025学年英语外研版八年级上册.docx
- 2024-2025学年小学数学五年级下册浙教版教学设计合集.docx
- 2024-2025学年小学劳动四年级下册人民版《劳动》(2022)教学设计合集.docx
- 2024-2025学年小学数学三年级上册冀教版(2024)教学设计合集.docx
- 2024-2025学年高中生物学必修1《分子与细胞》人教版教学设计合集.docx
文档评论(0)