- 1、本文档共73页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型桥梁结构基于ANSYS的优化分析与数值模拟-结构工程专业论文
华
华 中 科 技 大 学 硕 士 学 位 论 文
II
II
ABSTRACT
With the development of Chinas national economy and strong investment of national infrastructure construction, Nowadays Engineering structures appear the Phenomenon of Large volume,ultra height , intricacy of building structure, diversification of visual effects , ahead of the design ideas (mainly current design level beyond the level of theoretical research , a large number of super- regulatory buildings came into being ).The way to solve these difficulties are the accumulation of experience in engineering and raise the level of theoretical research.In specific complex engineering,the numerical simulation analysis of engineering structures is one of the key technologies of complex structural design and forming .
At first,This paper expounded the development process and the Research status of the numerical simulation;Summarized the characteristics and difficulties of the numerical simulation of complex structures.Then combining with engineering examples(fasting rigid frame bridge on Guizhou Beipan River and cable-stayed bridge on Zhaoqing River),made a numerical simulation analysis of specific projects in ANSYS.Numerical simulation results and specific project implementation process shown that the method was effective and the result was reasonable to handle large complex bridge structures of local model numerical simulation. The main contents of the thesis is as follows:
Numerical Simulation study of reasonable angle of hollow district of hollow rigid frame Beipanjiang bridge used super beam elements in ANSYS.obtained the main parameters of the fasting district under the state of cantilever construction. the length of the horizontal section of hollow district is about 45 meters, when Angle α between the lower chord and the pier is approximately 53° to 60 °,the mechanical properties of the hollow district are relatively best.
While taking into account the construction sequence,introduced the method of linear programming,to en
您可能关注的文档
- 大口径热煨弯管坡口机浮动切削原理及动力学性能研究-机械工程专业论文.docx
- 大口径离轴多程激光放大系统关键技术研究-电子与通信工程专业论文.docx
- 大口径油气管道带压不停输开孔机的开发研究-载运工具运用工程专业论文.docx
- 大口径背支撑反射镜架设计与分析-机械工程专业论文.docx
- 大口径超声流量计时间参数校准-仪器仪表工程专业论文.docx
- 大口径超声热量表的设计与实现-电子与通信工程专业论文.docx
- 大口径钢管端面几何参数视觉检测方法的研究-测试计量技术及仪器专业论文.docx
- 大口径透镜成像光谱仪研究-光学工程专业论文.docx
- 大口径长焦距扫描成像光学系统的设计-光学工程专业论文.docx
- 大口径长焦距扫描成像光学系统像质研究-光学工程专业论文.docx
最近下载
- 2024年河北省继续医学教育公共必修课参考答案.docx VIP
- 2023年高考全国甲卷语文真题(含答案).pdf
- 2024年河北省继续医学教育公共必修课参考答案.pdf VIP
- 3.6 树和喜鹊.ppt VIP
- (四级)综合布线职业技能鉴定备考题库资料大全-上(单选题汇总).pdf
- 12J1 工程做法 天津市建筑标准设计图集(2012版).docx
- 高中化学必修1判断题(含答案).docx VIP
- 2023年中国石油大学(北京)公共课《毛泽东思想和中国特色社会主义理论体系概论》期末试卷B(有答案).docx VIP
- 慢性呼吸系统疾病防治行动实施方案(2023-2025年).pdf
- 2024幼儿园公开招聘简章(模板).pdf
文档评论(0)