- 1、本文档共76页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大型并网光伏发电系统设计的方法与研究-热能工程专业论文
Abstract
With the sharp declineing in prices of polysilicon and national policies were introduced, the domestic large-scale grid-connected photovoltaic plant building opened one after another. At present, the domestic grid-connected photovoltaic plant start-up has only just begun, so more power plant design, lack of experience, lack of a mature design standards and criterion. This article focuses on research and investigation of system design method of large-scale grid-connected photovoltaic plant, by optimizing the rational design to bring reference observations for future power plant construction, and reduce the construction cost and increase economic benefits for the investor.
Based on theoreticses and experiments, We started to analyse and study in-depth actual issue for the power plant construction research experience. By comparing the traditional formula of calculation and experimental data, amending with the theoretical formula, finally, we achieved purpose of optimal design. The main content include: Bright resource assessment methods, and related theoreticses calculation, and introduced the principle of photovoltaic power generation, photovoltaic power plant design principle, the inverter selection, comparison of installation, the direct radiation section determined to meet the
120W/m2 Winter solstice,determining the best angle, pitch check, comparison of plain
scheme, line loss, the calculation of power generation, wind load capacity of components, without the foundation of the feasibility study and analysis. Through the winter solstice the shadow of the test, discovering the shadow value than the calculated value of 14.3% large, so square design in the time to consider the amendment on the distance formula to reduce impact on power generation result from the front row of the shadow block. To suffer wind load test component-based projection bracket tipping moment, and the anchors pulled out masterpiece after analysis and comparison of non-ground support t
您可能关注的文档
- 大功率集成封装白光LED的散热及响应面优化设计的研究-机械电子工程专业论文.docx
- 大功率风电增速箱振动响应及结构噪声分析-机械设计及理论专业论文.docx
- 大功率高压自起动永磁电动机电磁及传热特性的研究↑-电机与电器专业论文.docx
- 大功率高效率完全上进风燃气灶的研发-动力工程专业论文.docx
- 大功率高效率燃气灶研发-动力工程专业论文.docx
- 大功率高隔离PIN二极管收发开关电路设计与软件仿真研究-软件工程专业论文.docx
- 大功率高速光波导探测器的制作-光学工程专业论文.docx
- 大功率高精度永磁交流伺服系统关键技术研究-机械工程专业论文.docx
- 大功率高隔离功分合成器设计-电磁场与微波技术专业论文.docx
- 大功率高频开关电源的研究-电力电子与电力传动专业论文.docx
文档评论(0)