- 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
- 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
- 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
ICS 27.140
P 55
备案号:J 705—2007
中华人民共和国电力行业标准
DL / T 5381 — 2007
水电工程水库库底清理
设 计 规 范
Specification for reservoir basin cleaning
designing of hydroelectric project
2007-07-20 发布 2007-12-01 实施
中华人民共和国国家发展和改革委员会 发 布
I
目 次
前言 ········································Ⅱ
1 范围······································· 1
2 规范性引用文件·································· 2
3 总则······································· 3
4 库底清理范围··································· 4
5 库底清理项目··································· 5
6 卫生清理····································· 6
7 建(构)筑物清理·································14
8 林木清理·····································17
9 特殊清理·····································18
10 库底清理组织实施计划 ······························19
11 各阶段工作要求 ·································20
附录A(规范性附录) 库底清理工程量汇总·······················21
条文说明 ······································27
II
前 言
本标准是根据《国家发展改革委办公厅关于印发 2005 年行业标准项目计划的通知》(发改办工业[2005]
739号)的要求组织制定的。
为贯彻落实《大中型水利水电工程建设征地补偿和移民安置条例(中华人民共和国国务院令第471号)》
(以下简称《移民条例》),适应水电工程项目核准和水电工程建设需要,进一步规范水电工程建设征地
移民安置规划设计工作,在对 DL/T 5064—1996《水电工程水库淹没处理规划设计规范》修订更名为 DL/T
5064—2007《水电工程建设征地移民安置规划设计规范》的同时,组织编制了 DL/T 5376—2007《水电工
程建设征地处理范围界定规范》、DL/T 5377—2007《水电工程建设征地实物指标调查规范》、
您可能关注的文档
- 规范《DGJ32J35-2006-江苏省建筑安装工程施工技术操作规程-装饰工程》.pdf
- 规范《DLT5376-2007-水电工程建设征地处理范围界定规范》.pdf
- 规范《DLT5377-2007-水电工程建设征地实物指标调查规范》.pdf
- 规范《DGJ32J37-2006-江苏省建筑安装工程施工技术操作规程-脚手架工程》.pdf
- 规范《DGJ32J36-2006-江苏省建筑安装工程施工技术操作规程-防水工程》.pdf
- 规范《DGJ32J38-2006-江苏省建筑安装工程施工技术操作规程-结构安装工程》.pdf
- 规范《DGJ32J67-2008-商业建筑设计防火规范》.pdf
- 规范《DLT5382-2007-水电工程建设征地移民安置补偿费用概(估)算编制规范》.pdf
- 规范《DLT5383-2007-风力发电场设计技术规范》.pdf
- 规范《DLT5384-2007-风力发电工程施工组织设计规范》.pdf
文档评论(0)