- 1、本文档共71页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢筋锈蚀引起的混凝土保护层开裂过程及影响因素分析-结构工程专业论文
浙江大学工学硕士学位论文2007 ABsrRAffr
ABSTRACr
When the steel corrodes.the volume of rust is almost 2-4 times than the ori#nal and,thUS,exerts pressure 011 the concrete around the rebar;as the corrosion turn worse, the cover of concTete would crack.Once the crack happened,the corrosion would accelerated and the crack branch out,which results in destroy of the structures and the failure of the durability.So,it has practical value to analyze the crack process of the concrete cover due to the corrosion.
Based on the existing research,the main work of this paper Call be summarized
as follows:
1.For the case of the rebar uniform corrosion,the concept of destroyed-radius is brought up.Thc cracking process of the concrete cover is simulated by FEM analysis software,with assuming an uniform pressure applied On the concrete around the rebar
to simulate rebar uniform corrosion.Based∞the啪lytical results,the formula of
destroyed-radius of cover and the formula of critical corrosion expansive force are obtained;flirtheIlnore,the concretc cover cracking is analyzed and the formula of the corrosion expansive force and corrosion ratio are obtained,which is UScd to predict
the cracking time of the cover concrete.The缸a1妒cal cracking time achieves agreement with the test result well.
2.In order to simulate the cracking process of the concrete cover due to rebar
non-uniform corrosion,the concept of corrosion-degree-ratio is induced.On the basis
of the FEM analysis results by applying non-uniform displacement on the cencreto
around the rebar,the formula of corrosion·degree—ratio and corrosion ratio are
developed,which is used to predict the cracking time of。the cover concrete.The
analytical cracking time achieves agr∞mem with the test result well.
3.The effect factors analysis based on FEM shows that:Raising the strength of concrete and the thickness of cover concrete would delay the cracking of concrete; Stress superposition would appear due to the influence of a
您可能关注的文档
- 钢筋混凝土梁柱组合体在低周交变加载下的滞回规律模拟分析-结构工程专业论文.docx
- 钢筋混凝土梁斜截面受剪承载力计算方法研究-水工结构工程专业论文.docx
- 钢筋混凝土梁柱节点的承载力研究-结构工程专业论文.docx
- 钢筋混凝土梁桥损伤的动力法评估研究-结构工程专业论文.docx
- 钢筋混凝土梁柱组合体在低周交变加载下的滞回规律模拟研究-结构工程专业论文.docx
- 钢筋混凝土梁桥柔性铺装工作状态有限元研究-市政工程专业论文.docx
- 钢筋混凝土梁桥柔性铺装工作状态有限元分析-市政工程专业论文.docx
- 钢筋混凝土梁桥维修优化研究-土木工程;桥梁与隧道工程专业论文.docx
- 钢筋混凝土梁桥结构性能动力评估-桥梁与隧道工程专业论文.docx
- 钢筋混凝土梁的碳纤维布加固法的分析-结构工程专业论文.docx
文档评论(0)