网站大量收购闲置独家精品文档,联系QQ:2885784924

钢管混凝土拱桥拱肋吊装中的拱轴线形控制-桥梁与隧道工程专业论文.docxVIP

钢管混凝土拱桥拱肋吊装中的拱轴线形控制-桥梁与隧道工程专业论文.docx

  1. 1、本文档共59页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢管混凝土拱桥拱肋吊装中的拱轴线形控制-桥梁与隧道工程专业论文

武汉理工大学硕士学位论文At 武汉理工大学硕士学位论文 At the present time,with the development of the configuration analysis, architecture materials and building technology,CFST arch bridges’span becomes greater and greater.Because of it’S mechanical capability and convenience in building,CFST arch bridges are exerted largely on the span of 200m.But its own characters make the instability in building.So it is necessary to control it strictly. At the present time,the way of building CFST arch bridges is being suspended by cables.So we can use the Kalman filter,which is used greatly in Cable Stayed bridges,tO control CFST arch bridges’rib shape because it’S building process likes what of Cable Stayed bridges’.It’S reported someone had tried to do it.but not very perfectly.CFST arch bridges’rigidity is much lower than Cable Stayed bridges.This will make much great windage and must take into account all the effects synthetically and systemicly. This thesis contalns these contents of the control of CFST arch bridges’rib shape mainly: 1. Based on the No.3 bridge of Jiang Han,it analyses the effects,which may decide the rib shape,such as the effect of crosspiece on the rib,the plane excursion of the tower,the cable’S non—linear problem made by gravity,the elongation of cable and SO Oil. 2.At the same time,the paper also discusses how to cut down the windage made by these effects. 3.Cocluding the stess in the cables and the displacement of the rib’S top. 4.After observating the windage between the design and the practice,we can adjust the cable’S strain in construction to make the main arch coincide with the supposed axis. KEYWORDS:CFST arch bridge;Kalman Filter;Progress analytical method Rectify a deviation of end·point theory;shape of the rib II 武汉理工大学硕士学位论文第一章绪论 武汉理工大学硕士学位论文 第一章绪论 1.1钢管混凝土 1.1.1钢管混凝土结构的发展概况 钢管混凝土(CFST)结构就是将混凝土注入薄壁钢管内形成的一种介于钢 结构和钢筋混凝土结构之间的一种新型组合材料结构。19世纪中期,人们就开 始在需要密集布筋的混凝土杆件中预埋熬体刚度较大的钢管来代替布筋,此后 不久,钢管混凝土结构就得到迅猛推广。1879年,英国赛文铁路桥首次采用了 钢管混凝土桥墩,但当时在钢管中灌注混凝土的目的在于钢管防锈。1901年, Swell.J.S发

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档