- 1、本文档共64页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢管混凝土柱钢梁框架节点受力性能及承载力研究-结构工程专业论文
Study on Behavior and Load-Carrying Capacity of Concrete.Filled Tubular Column to Steel Bearn Connections
ABSTRACT
Along with widely spread USe of CFST(concrete·filled steel tube)structure, people have been paid more attention to the design of CFST joint.Institutes inland process massive research on CFST joint,most of them were aim at joint style,but the CFST column connected beam have a lot of questions,need to study deeply.
In this paper,we study the CFST joints with stiffening ring which were recommended by the national criterion.By using universal finite element analysis program:ANSYS 8.1,we carry finite element analysis on enforced loop joint of CFST.Compared with result of experimentation,finite element model can simulate real structure effectively.Through ten F.E.models,study on enforced loop plane from five aspects:(1)width of enforced loop plane;(2)thickness of enforced loop plane;(3)thickness of steel tubular;(4)axial load,(5)model of load.The analytical result is:With width and thickness of enforced loop plane increased,the bearing capacity ofjoint has been improved obviously.So width and thickness of enforced loop plane is important factors that affect bearing capacity ofjoint.As thickness of steel tubular increased,loading capacity has been few improved,SO thickness of steel tubular is not important factor.When put axial load on column,stress of enforced loop plane has been improved.Stress maximum value has been increased, the maximum is less than stress on final load,axial load contribute to loop stress value relatively lightly,thus needn’t consider affecting on joints.Finally,according to analysis on theory,put forward the design method,The design method is simple. It iS valuable method for design of CFST structure.
Keywords:Concrete··Filled Steel-·Tubular Column;Enforced Loop Plane;Joint;
Finite Element Analysis
图表清单
加强环肋板式节点 4
加强环承重销式节点 5
加强环穿心钢板式节点 5
钢筋环绕式加强环节点 5
方钢管混凝土柱节点(与钢粱连接) 6
试件的梁截面尺寸详图 12
钢管混凝土柱以及环板尺寸 13
压杆受力机理示意图 16
剪摩擦机理示意图 17
桁架机理示意图 1
您可能关注的文档
- 钢筋锈蚀耐久性基础研究-水工结构工程专业论文.docx
- 钢筋阻锈剂作用机理及效果研究-建筑与土木工程专业论文.docx
- 钢筋锈蚀的临界氯离子浓度与混凝土的剩余寿命预测-结构工程专业论文.docx
- 钢筋锈蚀对混凝土压弯构件变形性能的影响-结构工程专业论文.docx
- 钢筋阻锈剂的开发及机理研究-应用化学专业论文.docx
- 钢筋钢丝网砂浆加固混凝土柱的轴压、偏压及抗震滞回性能试验研究-结构工程专业论文.docx
- 钢筋锈蚀监测仪中护环法智能补偿技术的研究-应用化学专业论文.docx
- 钢筋非均匀锈蚀引起的混凝土保护层开裂有限元分析-结构工程专业论文.docx
- 钢管储运信息系统研究与开发-计算机应用技术专业论文.docx
- 钢管倒棱机夹紧机构系列的优化设计-机械工程专业论文.docx
文档评论(0)