- 1、本文档共72页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
片石土挡的土墙施工组设计.doc
合三路滑坡整治工程施工组织设计编制日期:二0一二年七月目 录编制说明········································编制依据及原则··································2.1编制依据·····································2.2编制原则·····································三····································
四·········································
4.1工程地理位置·································4.2施工场地周围环境·····························4.3工程地质·····································4.4工程范围及规模·······························4.5工程主要特点·································五5.1人员····························
5.2技术准备······································5.3材料组织供应··································六施工准备及临时设施·······························6.1临时房屋设施··································6.2水····································
施工组织机构的建立·······························7.1 组织机构设置·································7.2施工组织管理机构的运作························八施工计划··········································工期进度计划·································各施工队伍人员构成···························施工设备计划·································材料供应计划及措施···························九··········································
9.1挡土墙构造····································9.2填土施工要求··································9.3施工工艺流程··································9. 4衡重式挡土墙施工······························十10.1技术保证措施·································10.2质量管理措施·································10.3施工组织措施·································十一:····································
11.1安全施工主要措施·····························11.2安全保证体系·································十二,加强环保······························12.1文明施工·····································12.2施工现场环境保护····························12.3绿化工作措施·································十三:································
13.1一般保证措施·································13.2组织保证措施·································13.3技术保证措施·································13.4.经济保证措施··································13.5.合同保证措施··································十四·································
十五···
您可能关注的文档
- 渠道突管理.ppt
- 渠道管理pt课件.ppt
- 渠道理市场推广.ppt
- 渠道管理系统使用明课件.ppt
- 渠道膨胀土施工技术保障措施.doc
- 渡槽槽身施技术方案定稿.doc
- 温岭市污水处理二期建设理方案施工组织设计.doc
- 温州市城市中央绿轴公园(温州大道-瓯海大道)工程施工危险源监控专项方案.doc
- 温州城市中心区惠支路、南入口道路市政工程项目环境影响报告书(简本).doc
- 温室大棚建设工程施工组织计.doc.doc
- 《GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业》.pdf
- GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业.pdf
- GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 中国国家标准 GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 《GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法》.pdf
- 《GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数》.pdf
- GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数.pdf
- 《GB/T 17215.686-2024电测量数据交换 DLMS/COSEM组件 第86部分:社区网络高速PLCISO/IEC 12139-1配置》.pdf
- GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜.pdf
- 《GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜》.pdf
文档评论(0)