- 1、本文档共77页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
G318线康定~东俄洛公路改建工程环境影响研-环境工程专业毕业论文
j兰塞交通厶堂亟土堂位论塞
j兰塞交通厶堂亟土堂位论塞 △垦墨I丛盟
ABSTRACT
ABSTRACT:The Kangding—DongErLuo road in South Sichuan—Tibet Line is part of the 3 1 8-defense Line,and is also all important component of the West Sichuan Tourism Link(a wonderful tourist route in Sichuan province).It takes a lot of transit and local transportation task.Because of the lower grade of the road,seriously overloaded vehicles,and continual natural disasters(for example,landslides,water erosion,and mud-rock flow etc.),the lack of road repairs and maintenance,the road had been
damaged seriously,which increased vehicle operating costs and security risks.The road is obviously unable to meet the transport needs and constraints the local socio—economic
sustainable development.Therefore,the Kangding-Dongeluo road reconstruction project is imperative.In order to ensure or mitigate the ecological environment being damaged,the environment impact assessment(EIA)for the project is extremely important.
This paper studies on the EIA of the Kangding-Dongeluo road reconstruction
project.According to the characteristics of construction projects,the principles of the assessment includes:sections are combined with points while priority is given to the points;sections,as well as the whole line,is represented by points.In status quo
assessment,methods such as monitoring,surveying,calculation and analysis ets are
used.In prediction assessment,pattern calculation and analogy analysis are employed. The assessment of noise,atmosphere,ground water and soil and water loss is done by pattern calculation and analogy analysis,while in—situ survey is used to the ecological environment impact.
Then,a synthetic EIA of the Kangding-Dongeluo road reconstruction project is conduced with fuzzy synthetical evaluation method.The assessment involves elements
such as ecological environment,noise,atmosphere,water and social environment.
您可能关注的文档
- FP型光纤水听器数字解算法的分析.docx
- Freeedge托槽与传统托槽摩擦的比较分析.docx
- Frat1在非小细胞肺癌中的达及其与βcatenin TCF4相关性的分析.docx
- FPGA芯片关键电设计-微电子学与固体电子学专业毕业论文.docx
- Freeede托槽与传统托槽摩擦力的比较研究.docx
- FrA-1在IL-6导人结直肠癌侵袭及上皮间质转化中的作用研究.docx
- fr深基坑(槽)支护专项(板桩+机械大开挖放坡)施工方案及安全预案 (修复的).doc
- FRp-钢复合管约束混凝土方柱抗震能研究-土木工程、结构工程专业毕业论文.docx
- FRP约束混凝的应力应变模型及其在加固中的应用研究.docx
- FRP筋混凝土梁受力性能的试验分及有限元分析.docx
文档评论(0)