HD公司工程开发建设成本理研究-工商管理专业毕业论文.docx

HD公司工程开发建设成本理研究-工商管理专业毕业论文.docx

  1. 1、本文档共63页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HD公司工程开发建设成本理研究-工商管理专业毕业论文

AbstractAs Abstract As China’S economic transformation,downward pressure on huge economic growth,China’S economy into the new normal.Since the Spring Festival in 20 1 4 real estate sales quantity and sales prices have fallen month—on-month,real estate development at the end of the golden age of,the real estate is a new turning point,in the future market competition,the need to take measures to reduce costs,improve the competitiveness of the company. This article selected topic by the author in the enterprise the HD company as the research object,this paper introduces the general real estate development and construction process,this paper in the process of development and construction,due to the compression development time,speed up the pace of development,in the communication and management failures caused by increased,increase the cost of the project development and construction. In this paper,we study on real estate development and construction process of axis,first of all,introduction to enterprise proj ect development and construction, through to the enterprise in the process of the engineering construction cost management problems summarized analysis;Emphatically analyzed the enterprise in the engineering construction management at present,the specific cost management problems and caused serious losses;By looking for specific causes of the problem, the use of learning management knowledge,put forward some methods to improve management and reduce the occurrence of management problems,reduce the proj ect construction cost;Secondly,the author combined cost drive factors in the development process,put forward the way and the key point of the need to control, points out that the key tO cost control of each work,make the cost control key points clear,finally,aiming at each link of the problems,put forward specific management advice and can adopt specific measures for the administration,implementation of organizational change and update the management mec

文档评论(0)

186****0507 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档