- 1、本文档共24页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Factory Evaluation : Self Assessment
工厂评估:自我评估
All factories engaged in the production of Arcadia Group Plc merchandise must meet minimum
standards in each of the following areas:
所有从事生产Arcadia 集团商品的工厂必须满足以下方面的最低要求
1. Employment Ethics
雇佣道德
2. Health Safety practices
健康和安全保障
3. Technical Competence, relative to the product they will produce
生产相关产品的技术能力
4. Quality Assurance systems
质量保证系统
All suppliers to the Arcadia Group Plc must be familiar with these minimum standards, and must
accommodate visits by Arcadia Group Plc personnel or their appointed agents to evaluate and
audit a factory’s compliance.
所有Arcadia 的供货商都必须熟悉这些最低要求,并且为对工厂进行评估的Arcadia 人员或
其指定的人员提供协助。
* Suppliers are reminded that all premises involved in manufacture are subject to these standards.
This includes any subcontracted processes. (Subcontracting is processes beng carried out by
another factory unit.)
这些标准涵盖工厂的所有方面,包括外发转包生产工序(即由其它工厂承担的生产工序)
* Subcontracting must be declared at the time of order placement
外发转包工序必须在合同签定时注明清楚
* Manufacturing processes conducted from domestic premises are not acceptable to Arcadia
Group Plc. (Exceptional cases must have written approval of an Arcadia Group Plc Brand Director,
prior to order placement).
Arcadia 不接受家庭作坊承担的生产工序(除非在下定单之前已得到Arcadia 的书面确认)
The attached Self Evaluation Form should be submitted to Arcadia Group Plc by a supplier
proposing a new factory, or as an initial stage in the audit and approval process of any existing
factory.
所附之自评问卷必须在举荐一个新厂时或评估任何现存工厂的初期由供货商呈送Arcadia
* A new factory will not be approved, unless minimum requirements are achieved.
任何新厂只有满足这些最低要求, 才可被接受
* Existing factories must consistently achieve the minimums
现存工厂必须一贯满足这些最低要求
* If a shortfall is highlighted, an action plan to rectify this must be agreed
Timescales must be agreed appropriate to t
文档评论(0)