- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程跟踪审计毕业外文翻译.docx
中国地质大学长城学院
本科毕业论文外文资料翻译
系 别:管理科学与工程系
专 业: 工程管理
姓 名:
学 号:2015 年 03 月 03 0
外文原文
Project Tracking Audit
2014 -management for development series ?. Tracking Audit.
Joseph Duran.
With the rapid development of Chinas socialist market economy, the continuous improvement of peoples living standards, increasing social demand for the protecti on of sound and fast economic developme nt, the state has in creased its investme nt in infrastructure, i n order to meet the social power in creased demand for power plants as an infrastructure is constantly built. However, at all stages of the construction process of the plant, the functional departments will inevitably occur operations are not standardized, improper use of funds and other violations of trade regulations, to circumvent or minimize the phenomenon of violations occur; we need construction audit tracking.
Project Tracking Audit
Construction project tracking audit refers to an independent audit institutions and auditors (including the trial of the Association with the audit department of social agencies and professionals) use of audit techniques, in accordanee with re leva nt national laws, regulati ons and rules and norms, from an in vestment project for construction projects completion of delivery to the various stages of economic management activities real, legitimate, ben efits review, mon itori ng, an alysis and evaluation process. The purpose is to effectively control and a true reflection of the project cost, and safeguard the legitimate rights and interests, improve construction project management, and improve investment efficiency.
Project Tracking Audit Main Content
Construction phase of the project is the construction of the entire project during the Iongest time span, the largest change in phase. To this end the following aspects from the audit and control:
Mixed involved in the construction drawings.
Understand construction drawings to change the situation, be aware of, and drawi ngs joint hearing
您可能关注的文档
- 工商管理毕业自我鉴定.docx
- 工商管理毕业范文两篇.doc
- 工商管理类3.doc
- 工商管理系形象地位及公众舆论调查报告.doc
- 工商管理认识实习心得体会范文.docx
- 工商系统2017年开展315国际消费者权益保护主题活动演讲.docx
- 工商系统领导干部交流之利弊().doc
- 工商联年度工作总结.docx
- 工商行政管理机关党员教育活动讲话稿.docx
- 工商部门解放思想心得体会.docx
- 在线网课学习课堂《科学技术哲学专题(中央民族)》单元测试考核答案.docx
- 在线网课学习课堂《量化投资(中央财经)》单元测试考核答案.docx
- 雨课堂学堂在线《教育政策法(陕西理工)》学堂云单元测试考核答案.pdf
- 在线网课学习课堂《结构力学(空军工程)》单元测试考核答案.docx
- 在线网课学习课堂《金融法:金融科技与人工智能法(复旦)》单元测试考核答案.docx
- 雨课堂学堂在线《教育心理学(洛阳师范学院)》学堂云单元测试考核答案.pdf
- 雨课堂学堂在线《科研诚信与学术规范(中国农业)》学堂云单元测试考核答案.pdf
- 学生综合素质档案的教学管理创新机制教学研究课题报告.docx
- 学校劳动教育在新时代素质教育中的路径研究教学研究课题报告.docx
- 深度学习在科学实验中的创新应用研究教学研究课题报告.docx
文档评论(0)