SAP系统生产计划控制课程.ppt

  1. 1、本文档共166页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * * * The customer 需求 consumes the 计划 in非独立需求uirement 数量 that lies either directly before it or directly after it. If the 计划 in非独立需求uirement 数量 that lies directly before the customer 需求s does not cover the customer’s 需求, then the system looks for the next closest 计划 in非独立需求uirements either in the future or the past. During this process, the system refers to the consumption periods maintained in the material master or in Customizing for Demand Management (see above). The consumption periods determine the intervals (for backward or forward consumption) within which customer 需求s consume 计划 in非独立需求uirements. Customer 需求s which lie outside the consumption period are not consumed. * * In MPS, the master 排程 items are 计划, that is, the planning run is carried out at critical part level only. 非独立需求uirements are 创建d for the BOM level directly below the planning level. Levels below this, however, are not 计划. This means that you can authorize any changes to the master plan before they affect the various BOM levels. This procedure ensures that planning remains consistent and transparent. The results of the planning run are not passed on to dependent parts until the master plan for the critial parts has been processed and finely tuned. This planning run can be carried out both as total planning and as single-item planning. In a second step, it is possible to start material 需求s planning for all BOM levels from MPS. * * * * You can protect the master plan from any automatic changes to master 排程 items in the near future by using a planning time fence. During the planning run, the system makes no automatic changes to 订单 proposals within the planning time fence (which is specifically determined for every master 排程 item). The system always dynamically 计算s the end 日期 of the planning time fence starting from the planning 日期. * You specify how the system is to determine the lot size by 选择ing one of the lot-sizing procedures in the material master record. The system uses the result of

文档评论(0)

kbook + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档